City Construction Projects
1103 N Woodburn AVE
- Case Date:
- 1/22/2003
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
City Construction Projects
1210 W 8th ST
- Case Date:
- 12/14/1995
Street Dept. is installing a handicap ramp in front of his property. He says that the property is not handicap accessible and that there shouldn't be a ramp there. Sidewalk crews told him that they are required to put in ramps per ADA.
City Construction Projects
806 W 4th ST
- Case Date:
- 6/20/2011
The sidewalks in front of 806 & 810 W. 4th Street are in very poor condition. They are crumbling and cracked. They are hazardous to walk across and need to be replaced.