City Construction Projects
901 W 1st ST
- Case Date:
- 6/30/2025
Cable hanging down on sidewalk near corner of W. 1st and WylieEuclid. Duke came and said not theirs prob phone or internet cable. Checked with one internet company (Comcast) and 14 day wait. The cable is on the sidewalk and a hazard in many ways. It seems to be possible related to the movement and placement of construction poles during demos and renovations to the East.
City Construction Projects
728 W Allen ST
- Case Date:
- 1/24/2023
Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.
City Construction Projects
723 W Allen ST
- Case Date:
- 3/29/2025
Entire roof being removed in historic district - concerns it is not permitted work and concerns for spread of moldy / asbestos contaminated insulation being thrown
City Construction Projects
1101 S Rogers ST
- Case Date:
- 10/2/2024
On this property on the Allen street side, AEG left a 2ft wide and 3ft deep hole. This was months ago and the homeowner has left several messages. Also across from her property on Allen Street is an even larger whole near the sidewalk that was left by AEG.