closed #147255
City Construction Projects
555 N Morton ST
- Case Date:
- 8/11/2015
Side walk lift (5")
Side walk lift (5")
Curb blown apart, with exposed rebar.
Subsidence of manhole cover. (Water) I have seen no less than 3 people stumble due to 1/2" drop. Maybe bevel edge of brick.
Water shut off cover missing
Yikes! The rise of the sidewalks has started. Corner of constitution and Curry
Erosion due to over sized semi's
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
Construction site utilizing alleyway creating potholes and divots
A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?