closed #170679
City Construction Projects
301-399 S Mitchell St, Bloomington, Indiana, 47401
- Case Date:
- 10/10/2019
Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.
Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!
Whenever I return home from work every night, I am always greeted by the mud from construction. Someone else has reported this issue December last year, but I don’t see any improvement.
A contractor (possibly PCT?) installing a utility pole at NW corner of Lincoln and Smith is blocking the alley and blocking parking on private property.
The new sidewalks on the northwest corner of Sare and Rogers have been badly damaged from utility trucks driving on them. There could have been some plywood or metals plates used to cover the walks to protect them.
New Island in the middle of Tapp road just east of Kegg is not marked with any traffic cones or signs, hazardous, difficult to see
2901 Olcott. Dead branches, over sidewalk and street. Hit by trucks, knocked down by storms.
Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.
Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.