City Construction Projects
320 N Jacob DR
- Case Date:
- 4/30/2025
Cut pavement hole by city 3 months ago and never blacktop. Hole is still there and very, very annoying!! I believe it’s a job unfinished or forgotten by city workers transportation department!
Thank you
City Construction Projects
317 S Rogers ST
- Case Date:
- 12/6/2023
I let you know there duke engery doing road work 321 N Rogers St
Bloomington, IN 47404
United States
City Construction Projects
317 E Allen ST
- Case Date:
- 5/19/2021
The bolts sticking out of the speed bump are a hazard.
City Construction Projects
314 E 11th ST
- Case Date:
- 11/12/2025
An old house was demolished on Friday 7 Nov. It had been clad in cement tiles, likely asbestos-containing transite. It appears that there was no attempt to isolate the hazardous waste from the bulk, so is it now all classified as hazardous? If so, is the contractor required by the State to dispose of the mass of waste resulting from the demolition in a special way, or perhaps into a designated landfill that accepts such waste? Attached is a picture of tiles that were left strewn about on the alley (a public thoroughfare) after the demolishers drove away. In the days since, people and/or animals have been stepping on the tiles and crushing them, possibly releasing friable asbestos fibers. There is a dog living immediately across the alley from this now toxic site. Is it unsafe for the dog to walk on the ground in this area? Or does the City even care about such things? Maybe it would it be better to just look the other way and let the people with money do whatever they please (?)
City Construction Projects
312 N Park Ridge RD
- Case Date:
- 5/12/1997
She called to lodge a complaint about the speed humps that have been installed on Morningside Drive. She lives in Park Ridge east and can't "catch the light" at Smith and 3rd and can't use 10th Street because of the "awful bicycles". She says we have just created "one large driveway " for the people who live on Morningside.
City Construction Projects
3110 N DAVID DR
- Case Date:
- 7/12/1995
City Construction Projects
309 N Walnut ST
- Case Date:
- 6/16/1999
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
City Construction Projects
3073-3099 E Moores Pike, Bloomington, Indiana, 47401
- Case Date:
- 12/6/2019
Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.
City Construction Projects
305 S Lincoln ST
- Case Date:
- 6/24/2022
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
City Construction Projects
304 S Rogers ST
- Case Date:
- 8/28/1997
After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed.
See letter