uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (242)

closed #184157

City Construction Projects

226 S College AVE

Case Date:
6/12/2023

I was walking along the North side of 3rd st with my children and found the railing here was easy to move and break. I can see there were a few stablizing posts but the are not working. It is broken and unsafe and any adult who doesn't know this and leans on this or tips into it could easily fall onto 3rd st. Please fix asap

closed #121701

City Construction Projects

225 N DANIEL'S WAY

Case Date:
10/9/1995

Tree of Life has made a road cut to Knapp Road without the proper approvals. The cut was made last weekend.

closed #179625

City Construction Projects

2225 S High ST

Case Date:
4/23/2022

A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?

closed #36516

City Construction Projects

2215 W 3RD ST

Case Date:
6/16/2004

Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.

closed #172047

City Construction Projects

2208 E Arden DR

Case Date:
3/22/2020

Hello -- this cover has a hole in it and that seems dangerous.

closed #112096

City Construction Projects

2202 S Rockport RD

Case Date:
4/18/2000

There is currently straw around the drainage ditch in front of 2202 S. Rockport. There is not any grass growing, it is all mud filled. There is now a cement stone on the property, left from the construction, and the complaintant can not mow around it. Please call Ms. Smith with any updates on the situation.

closed #179583

City Construction Projects

214 E 15th ST

Case Date:
4/20/2022

Construction site utilizing alleyway creating potholes and divots

closed #59168

City Construction Projects

2100 S Bent Tree DR

Case Date:
2/3/1999

Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.

closed #147579

City Construction Projects

205 E 17th ST

Case Date:
8/22/2015

Water shut off cover missing

closed #159806

City Construction Projects

201-251 North Lincoln Street

Case Date:
6/21/2017

Hi, There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires. Thanks, Vickie Nelson Bloomington