Search Results: (79)

closed #66744

City Construction Projects

W TAPP RD

Case Date:
8/20/1997

Noticed that City has blocked off the road through the medical center/COTA which was acting as an alternate route around the Tapp Road work. State is working on 37 exits for Fullerton Pike and Rockport Road and has them down to one lane. This is creating a very dangerous situation since Rockport is the official Tapp Road detour. Someone should look at this and open the road through the medical center or see if something else can be done before someone is killed.

closed #118693

City Construction Projects

S ROCKPORT RD

Case Date:
9/18/1997

Rockport between 37 and Country Club has become very hazardous during the detour. Tapp Rd construction has taken far too long for the size of the project. Its not a long section of road. why hasn't this project been finished and reopened? If there's a valid problem, city or county should monitor the traffic.

closed #118726

City Construction Projects

S COLLEGE AVE

Case Date:
9/8/1997

Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.

closed #118727

City Construction Projects

S COLLEGE AVE

Case Date:
9/8/1997

Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.

closed #70268

City Construction Projects

S ADAMS ST

Case Date:
11/7/1996

STREET CAVING IN WHERE WORK WAS DONE

closed #120942

City Construction Projects

S ADAMS ST

Case Date:
11/7/1996

STREET CAVING IN WHERE WORK WAS DONE

closed #103218

City Construction Projects

HARDY + FISCUS

Case Date:
6/10/2003

new hydrant installed gravel needs to be repaired + backfield

closed #76297

City Construction Projects

E COVENANTER DR

Case Date:
10/9/1996

It is Mike's understanding that Covenanter Dr. is not to be used as an access road for construction of condos south of Eton Mews. Mike saw two dump trucks go through this morning that he thinks belongs to Rogers Group.

closed #60148

City Construction Projects

925 S Ballantine RD

Case Date:
10/22/1998

The residents at 925 S. Ballantine had a contractor make a street cut across Ballantine. The cut is sinking in and has become dangerous.

closed #65536

City Construction Projects

904 S Rose AVE

Case Date:
12/18/1997

MOUND OF DIRT LEFT IN YARD , WOULD LIKE YARD REPAIRED