uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (79)

closed #54387

City Construction Projects

100 E 6th ST

Case Date:
4/7/2000

due to the project at 7th and Walnut the lack of striping in the 100 Block of E. 6th is even more critical than before. Please ASAP stripe the angle parkinging in the 100 jBlock of E. 6th.

closed #71125

City Construction Projects

101 S Smith RD

Case Date:
5/28/1996

AT THE CORNER OF MORNINGSIDE DRIVE & SMITH ROAD. THE CITY FINISHED THEIR PROJECT OUT THERE ABOUT A YEAR AGO THERE IS A SMALL PLOT OF LAND AT THIS INTERSECTION THAT HAD SOD PUT DOWN. THE GRASS DIED AND MR. BROTHERS WOULD LIKE FOR THE CITY TO REPLACE THIS PORTION. THIS AREA IS IN THE CITY RIGHT OF WAY. JANE FLEIG DID GO OUT TO TAKE A LOOK AT SITE ON 5/28/96.

closed #107789

City Construction Projects

110 S Clark ST

Case Date:
9/19/2001

Ms. Ritter stated that a street cut was done in front of her house and that the street cut has fallen in. She thought that the cut was made to repair a gas line, but said that the City made the cut?

closed #103141

City Construction Projects

1101 N COLLEGE ST

Case Date:
6/20/2003

Line torn out by contractor with backhoe.

closed #41837

City Construction Projects

1103 N Woodburn AVE

Case Date:
1/22/2003

Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.

closed #121344

City Construction Projects

1105 S Rogers ST

Case Date:
5/15/1996

recent cut--cut repair is very rough and deteriorating

closed #62098

City Construction Projects

111 S ROGERS ST

Case Date:
8/20/1998

Mrs. Myers called on behalf of her son, Joe Myers, because the alley-way running from Rogers St. east -west near the Rogers St. fire station needs to be paved. She wants the Street department to have more money so that they can pave her alley sooner than the fall of 1999, when Bobby Chestnut told her it would be paved.

closed #116189

City Construction Projects

111 S ROGERS ST

Case Date:
8/20/1998

Mrs. Myers called on behalf of her son, Joe Myers, because the alley-way running from Rogers St. east -west near the Rogers St. fire station needs to be paved. She wants the Street department to have more money so that they can pave her alley sooner than the fall of 1999, when Bobby Chestnut told her it would be paved.

closed #38382

City Construction Projects

1116 S College Mall RD

Case Date:
1/8/2004

Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.

closed #38973

City Construction Projects

1116 S College Mall RD

Case Date:
10/20/2003

Desires a cleanout for the slotted drain in the driveway. Desires a tree well for the gum tree on north side of drive. Desires drainage improvements on the southeast side. Desires opening in the median.