City Construction Projects
401 N Morton ST
- Case Date:
- 8/9/1996
Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.
City Construction Projects
401 N Morton ST
- Case Date:
- 8/9/1996
She's at Walnut & Wylie. Why hasn't anything been done about Wylie Street in a month or more? She's losing business and Wylie Street residents are using her parking lot.
City Construction Projects
3751 W Tapp RD
- Case Date:
- 8/7/1996
Mr. Hoover called to complain about the recent construction on Tapp Road. He believes the construction caused his driveway to crack. I referred Mr. Hoover to Risk Management Department.
City Construction Projects
1409 S Madison ST
- Case Date:
- 7/24/1996
1200-1300 S.MADISON (FROM GRIMES TO HILLSIDE) REYNOLDS CONSTRUCTION DOING
WORK FOR UTILITIES DEPT. EXCESS DIRT/SAND NEEDS TO BE SWEPT UP.
City Construction Projects
1105 S Rogers ST
- Case Date:
- 5/15/1996
recent cut--cut repair is very rough and deteriorating
City Construction Projects
418 W Joy ST
- Case Date:
- 1/17/1996
Wants information regarding proposed development at the intersection of S. Rogers and Rockport Road. Also, upset that these roads and sidewalks may be widened unnecssarily and the elderly do not need extra taxes. The speed limit on rogers should be lowered too.
City Construction Projects
225 N DANIEL'S WAY
- Case Date:
- 10/9/1995
Tree of Life has made a road cut to Knapp Road without the proper approvals. The cut was made last weekend.
City Construction Projects
502 N INDIANA AVE
- Case Date:
- 8/1/1995
WITH THE NEW SIDEWALK GOING IN ON 500 BLOCK OF INDIANA, MR. DEKALB IS CONCERNED ABOUT HIS RETAINING WALL.
City Construction Projects
3110 N DAVID DR
- Case Date:
- 7/12/1995
City Construction Projects
1204 E Wylie ST
- Case Date:
- 5/17/1995
A section of sidewalk was removed last fall and was never replaced.