City Construction Projects
1116 S College Mall RD
- Case Date:
- 1/8/2004
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 10/20/2003
Desires a cleanout for the slotted drain in the driveway.
Desires a tree well for the gum tree on north side of drive.
Desires drainage improvements on the southeast side.
Desires opening in the median.
City Construction Projects
111 S ROGERS ST
- Case Date:
- 8/20/1998
Mrs. Myers called on behalf of her son, Joe Myers, because the alley-way running from Rogers St. east -west near the Rogers St. fire station needs to be paved. She wants the Street department to have more money so that they can pave her alley sooner than the fall of 1999, when Bobby Chestnut told her it would be paved.
City Construction Projects
111 S ROGERS ST
- Case Date:
- 8/20/1998
Mrs. Myers called on behalf of her son, Joe Myers, because the alley-way running from Rogers St. east -west near the Rogers St. fire station needs to be paved. She wants the Street department to have more money so that they can pave her alley sooner than the fall of 1999, when Bobby Chestnut told her it would be paved.
City Construction Projects
1109 E Wylie ST
- Case Date:
- 10/21/2024
20x20 site of digging, with tarps in place and visible cones. Neighbors say some crew started this last week, then abandoned it.
I certainly did not give anyone permission to enter my property, and if this is a right of way, it does not show on the plat.
I want it remediated, repaired, and reimbursement for the costs of this destruction of private property.
I'll contact the city attorney tomorrow.
City Construction Projects
1107 S Washington ST
- Case Date:
- 5/14/2025
Gigabit workers left big utility mess —hazardous! I reported to them in February & contacted them several times but no repair—
City Construction Projects
1106-1112 South Graywell Drive
- Case Date:
- 8/16/2017
Does the city have a plan for taking in, and disposing of, our old trash bins and cans? Saying that "Residents are encouraged to reuse their old trash cans as yard waste containers" seems ingenuous. How long a yard waste season goes Bloomington have? -- 6 months? Where will I store 2 35-gal. cans and a 20-gal., plus the 3 bins currently used for recycling -- since my garage will be filled up with two 64-vallon containers?
City Construction Projects
1105 S Rogers ST
- Case Date:
- 5/15/1996
recent cut--cut repair is very rough and deteriorating
City Construction Projects
1103 N Woodburn AVE
- Case Date:
- 1/22/2003
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
City Construction Projects
1101 S Rogers ST
- Case Date:
- 10/2/2024
On this property on the Allen street side, AEG left a 2ft wide and 3ft deep hole. This was months ago and the homeowner has left several messages. Also across from her property on Allen Street is an even larger whole near the sidewalk that was left by AEG.