City Construction Projects
720 W 7th ST
- Case Date:
- 9/9/2019
I may have sent this to the wrong department earlier today. Cars are parking regularly in front of the hydrant on the North East corner of Maple Street at West 7th. Can you please come and repaint the curb? You guys did a great job repainting the curbs on W 7th but the curbs on Maple need it too. Thanks.
City Construction Projects
600 W 6th ST
- Case Date:
- 9/12/2019
I feel like the city should know that I broke my foot walking down the horrible Near West Side sidewalk last week.
City Construction Projects
320 W 8th ST
- Case Date:
- 1/15/2020
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!
City Construction Projects
2701 E 3rd ST
- Case Date:
- 8/30/2020
Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.
City Construction Projects
1398 W 8th ST
- Case Date:
- 9/5/2020
Huge hole in the road on the corner of 8th and Fountain.
City Construction Projects
507 E Kirkwood AVE
- Case Date:
- 9/10/2020
Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.
City Construction Projects
417 W Kirkwood AVE
- Case Date:
- 6/1/2021
This is located at the Southeast corner of the parking lot. This is one of several trees needing attention. We would prefer this one to be removed. Also, the broken-off trunk was from a storm damaged tree 2 years ago. Can we get that removed, or at least cut flush to ground level? We are converting these mulch beds to rock beds.
City Construction Projects
105 W 4th ST
- Case Date:
- 1/12/2022
Level 1 stairway exit (alley way access) - Standpipe (Fire Dept.) leaking and water is accumulating on landing in front of exit door, may ice as temps fall.
City Construction Projects
214 E 15th ST
- Case Date:
- 4/20/2022
Construction site utilizing alleyway creating potholes and divots
City Construction Projects
301 E 20th ST
- Case Date:
- 8/18/2022
Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!