City Construction Projects
3751 W Tapp RD
- Case Date:
- 8/7/1996
Mr. Hoover called to complain about the recent construction on Tapp Road. He believes the construction caused his driveway to crack. I referred Mr. Hoover to Risk Management Department.
City Construction Projects
1409 S Madison ST
- Case Date:
- 7/24/1996
1200-1300 S.MADISON (FROM GRIMES TO HILLSIDE) REYNOLDS CONSTRUCTION DOING
WORK FOR UTILITIES DEPT. EXCESS DIRT/SAND NEEDS TO BE SWEPT UP.
City Construction Projects
1105 S Rogers ST
- Case Date:
- 5/15/1996
recent cut--cut repair is very rough and deteriorating
City Construction Projects
418 W Joy ST
- Case Date:
- 1/17/1996
Wants information regarding proposed development at the intersection of S. Rogers and Rockport Road. Also, upset that these roads and sidewalks may be widened unnecssarily and the elderly do not need extra taxes. The speed limit on rogers should be lowered too.
City Construction Projects
1124 S College Mall RD
- Case Date:
- 10/16/2003
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.
City Construction Projects
1101 N COLLEGE ST
- Case Date:
- 6/20/2003
Line torn out by contractor with backhoe.
City Construction Projects
2380 E Linden Hill DR
- Case Date:
- 6/17/2003
City Construction Projects
HARDY + FISCUS
- Case Date:
- 6/10/2003
new hydrant installed gravel needs to be repaired + backfield
City Construction Projects
401 N Morton ST
- Case Date:
- 6/10/2003
City Construction Projects
401 N Morton ST
- Case Date:
- 5/25/2005
citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".