closed #210896

City Construction Projects

Case Date:
5/21/2026

I appreciate the paving happening and the difficulty in controlling traffic around it downtown, but the crews need more signs and flaggers ASAP

closed #210881

City Construction Projects

201 N Morton ST

Case Date:
5/20/2026

I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area

closed #210880

City Construction Projects

350 W 7th ST

Case Date:
5/20/2026

I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area

closed #210507

City Construction Projects

1701 E Greenbriar LN

Case Date:
5/5/2026

As a result of AT&Ts recent fiber optics installation, there are two large sink wholes next to the sidewalk between my address and my neighbors house. I called Austin Voorheis who did the installation for AT&T, but he has not come to fill in the openings. Photo's attached. This is really dangerous.

closed #210041

City Construction Projects

335 S College AVE

Case Date:
4/20/2026

Construction crews for the convention center are regularly blocking the drive to 335 S. College.

closed #209801

City Construction Projects

Walnut Pike and Heather Dr. Peppergrass entrance

Case Date:
4/6/2026

Previous city project. Soil washing away under sidewalk

closed #209758

City Construction Projects

320 W 8th St #113

Case Date:
4/3/2026

Soil washing away under side walk. I have reported this area before and it seems to be getting worse. Is there a plan?Thank you for your time. Kaye Beavers, Peppergrass landscape director

closed #209025

City Construction Projects

Case Date:
3/5/2026

Recently we have had sewer problems at 1901 S. Rogers Street Bloomington. Upon digging up the main line we found what appears to be a fiber optic line that severed our main sewer line when contractors were working recently. Could we please find out the contractors that had ROW or who to contact. We are a no profit agency and do not have the budget for this costly repair. Thank you.

closed #207491

City Construction Projects

250 S Washington ST

Case Date:
1/7/2026

The placement of this sign narrows the sidewalk way down here between the utility box and the street lamp pole. The narrowing in proximity to the handicapped ramp should be of concern. thanks!

closed #206881

City Construction Projects

2nd and rogers

Case Date:
11/20/2025

When paving projects done by old hospital