uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (3)

open #211610

City Construction Projects

111 E 6th ST

Case Date:
6/11/2026

There is construction happening in the alleyway of 111 E 6th St, which is behind the Btown Smoke Time (corner of walnut and sixth). My apartment is in this alleyway, and there is no other access besides the alley door. The construction is currently blocking me from entering my apartment, and is blocking my roommate from leaving the apartment, because they have torn the alley out and blocked any alley entrance with heavy machinery. While I’m sure this was a necessary project, this is something that needs to be informed to residents if they are going to be blocking them inside/outside of their homes.

open #211439

City Construction Projects

3230 S Walnut ST

Case Date:
6/8/2026

Sidewalk at the ongoing construction at new Bloomington Fire Operations Center is blocked with no alternate accessible path for pedestrians. Wheelchair user had to use the vehicle driving lane on busy road in order to get around the blocked sidewalk, because the shoulder of the road was also obstructed by cones and tape.

open #206166

City Construction Projects

1205 1/2 S Rogers ST

Case Date:
10/7/2025

Someone needs to check on the construction crew working Rogers Street in the Patterson area. They are blocking the sidewalk with their materials on the east side near the warehouse. One of the contractors unexpectedly pulled his truck out onto the street to block a vehicle and then pulled it out aggressively again almost causing an accident. When confronted about this being unsafe he said “I can do whatever I want“.