uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (244)

closed #153977

Traffic Related Complaints

Case Date:
7/11/2016

The construction crew on South Sare road at the new apartments started setting up safety barrels at 7:45am. They blocked traffic for 10 min. They had no signs up, and there were to many of the workers standing and talking to the flaggers keeping them distracted and in the road making the conditions unsafe to the workers and motorists. One worker was laughing and turned without looking and almost got hit by 1 of the many drivers that were forced to turn around in the middle of the street due to being late for work and very long lines. Several of the workers did not have their safety helmets or safety vests on. And the last several work days they have left the road in muddy conditions making the road slippery when it rains. I live in the apartments adjacent to the construction site and have witnessed cars slightly sliding when they have to hit theirs brakes quickly due to the heavy traffic and the heavy population in the area. Please have the crews take care of the safety issues and concerns. I know when I was inspecting for smithville communications during their mass construction a few years ago that I was asked to have the crews I was in charge of to wait until after 8am to set up any work that required a flagger unless it was an ongoing job and the barrels were left out from the previous day with a temporary stop light and warning signs. Thank you Ben Kirk

closed #153978

Traffic Related Complaints

Case Date:
7/11/2016

Construction hazards on SARE Rd, lanes not properly shut down, no signs, construction had me in standstill traffic for OVER TEN MINUTES on my way to work this morning at 8 AM, should NOT be allowed to close lanes during morning rush hour, people holding signs to direct traffic were not coordinating with each other causing more hazards, again very upset they are even allowed to close lanes that early on a job that is nonemergency, will continue to complain to every channel necessary to get this RIDICULOUS problem solved so I am not late to work again

closed #154103

Traffic Related Complaints

Case Date:
7/16/2016

Abandon vehicle Howe st just east of rogers. Howe and rogers

closed #154768

Traffic Related Complaints

Case Date:
8/11/2016

Third Street between Woodlawn and Indiana intersection is a problem. It narrows to one lane near Indiana, but the traffic at the light at Woodlawn does not know it will narrow. This results in traffic tie ups and unsafe manouvering to get a better spot in line. Please move the warnings and signs about the single lane closer to the traffic light at Woodlawn, if they can see the problem earlier it will be safer. Someone tried to cut ahead by using the bike lane and sidewalk today.

closed #155041

Traffic Related Complaints

Case Date:
8/23/2016

With students returning, I've noticed an uptick in traffic speeding down North Washington between 12th and 10th street. I feel like the problem is only going to increase as the new apartment building at 714 N Walnut is completed. With several children that play in the neighborhood, I'm concerned with their safety. Can traffic calming measures be investigated for this area?

closed #155250

Traffic Related Complaints

Case Date:
8/30/2016

I drive for Uber/Lyft in Bloomington. The number of stop signs that I have noticed that are blocked or partially blocked by foliage is approximately one in very ten. I stop at roughly 500 of these signs per 9 hour shift ant it is dangerous. Also the smaller alleys have so much over growth that they scratch the side of the vehicles. Does Bloomington not have a forestry division with a chainsaw or two to fix both these hazards.

closed #150450

Traffic Related Complaints

Case Date:
1/31/2016

Cars parked in lawn front and back yard. Davisson st.

closed #150496

Traffic Related Complaints

Case Date:
2/1/2016

New stop light at Rolling Ridge way had traffic on 2nd street backed up to The Eye Center at 5:10pm. Usually takes around 10 minutes for me to get home it was 20 due to the poor timing of the new light. There was a time around 5:20pm where the light was only green going down 2nd street for a minute before it turned red. Safety concern as well for ambulances trying to get down 2nd street (especially by the co-op where there is cement barriers in the middle of the road). Will be a huge concern when 37 (I-69) 2nd street ramps under construction in a few months.

closed #150512

Traffic Related Complaints

Case Date:
2/2/2016

Good Evening, Since the light at Ridgeway (I'm pretty sure that's the st, it's right in front of Twin Lakes Gym) and 2nd Street started working on Monday traffic in the morning, but especially in the evening, has been horrendous on 2nd St. It is now currently taking me about 40 minutes to get from the IU Campus to Eller Rd when leaving campus around 5:15. Traffic is bumper to bumper from 2nd and Rogers until after the new light. I feel like this is not just a ridiculous amount of traffic for a city the size of Bloomington, but that it is creating dangerous traffic situations. I'm afraid it's going to cause accidents. Thank you for your time. Sincerely, Holly Hooper

closed #155585

Traffic Related Complaints

Case Date:
9/8/2016

There are branches hitting our busses on Allen Street between Dunn and Grant Streets. Please let me know who I should contact directly.