closed #174438

Traffic Related Complaints

1419 S Sare RD

Case Date:
1/5/2021

Finish this construction already. The west bound turn lane onto E moore's pike is still partially unpaved. One must dip half of their vehicle into unpaved asphalt. Additionally, the signage is incorrect/outdated at this intersection. Finish the job you started.

closed #174488

Traffic Related Complaints

1419 S Sare RD

Case Date:
1/12/2021

I don’t know what kind of people were hired, but this intersection is HORRIBLE. It’s dangerous, and people are going to get hurt

closed #179411

Traffic Related Complaints

1413 S Dunn ST

Case Date:
3/31/2022

Please make South Dunn Street between Grimes and Hillside One-Way only, Northbound. This is a very narrow street. Oftentimes, traffic travels through here at a high rate of speed. If there is more than one car traveling on the street at a time in opposite directions, we frequently have to pull to the side into parking (if room) or one car has to either stop at an intersection to allow the car to pass, OR one of the cars have to back up into a parking space or another intersection to let another car pass. PLEASE consider making my street a one-way street Northbound which would align with the only available parking spaces on the side of the street. THANK YOU! :-)

closed #172698

Traffic Related Complaints

1408 W 17th ST

Case Date:
6/7/2020

When will W 17th St reopen? No construction activity during the past 2 weeks...........

closed #187745

Traffic Related Complaints

1231 W 7th ST

Case Date:
3/22/2024

Between approximately 1910 until about 1925 on 3/21/24, I witnessed 6-8 vehicles drive south in the northbound lane in the construction area from Fountain then turning west on 7th St. The vehicles ranged from a full-size truck pulling a trailor, the kind to haul a riding lawnmower, to an either 2-door or small 4-door car and judging from the high speed at which the car drove and the timing of the next northbound car, the southbound car entered the construction zone at the same time or after the northbound car entered from Kirkwood. This was all within 15-20 minutes on the 4th day of the closure.It's going to be a problem.

closed #177000

Traffic Related Complaints

021C, Bloomington, IN 47408, USA

Case Date:
8/15/2021

Temporary lane markings were left after construction of 7th street bike lane, but they appear to be incomprehensible to majority of traffic and are also peeling off of pavement. Westbound cars regularly drive in the left-side, oncoming lane, or directly in middle of both lanes. Either method is a hazard to eastbound traffic as well as westbound traffic turning left onto Dunn as cars in left lane will try to go straight past turning traffic. Temporary directional arrows were installed but seem to have made no improvement. Disaster waiting to happen.

closed #179499

Traffic Related Complaints

Case Date:
4/11/2022

The stop signs along 7th got taken out over the summer and number of car accidents at the corner of 7th and Dunn has risen considerably. I get what you're going for with the straight shot through to campus, but I would appreciate if you'd reevaluate if it's worth it specifically at this one intersection. At first I thought people would get used to it and accidents would slow down, but this has not been the case. This spring the number of accidents has been RISING and there have been THREE ACCIDENTS in the last 48 hours. The sickening sound of crumping automobile plastic, going out to worry about injuries on the part of the involved parties, and having traffic stopped in front of my house on a weekly basis has made living here substantially worse. I think part of the problem is that this intersection REALLY looks like it should have a 4 way stop, and this can be seen by the frequency of drivers unnecessarily stopping on 7th, assuming they have a stop. Also, heading South on Dunn the turn is almost completely blind to the left and cars traveling quickly down 7th are given almost no chance to stop.

closed #183260

Traffic Related Complaints

Case Date:
3/28/2023

Will the City work with Duke Energy and its contractors to properly manage traffic around the work of Duke de-beautifying Bloomington? The flaggers are not helpful and not managing traffic in an efficient way to keep people moving safely around the work. As a driver, you are just on your own to try to figure out what some person lazily waving a flag in the breeze intends for you to do, and go head-on against oncoming traffic who also has no clue what to do.

closed #184575

Traffic Related Complaints

Case Date:
7/12/2023

The traffic management by the company doing construction at the intersection of Henderson and Winslow is really frustrating. I know disruption is expected with construction, however, I would expect: 1. some clear signage, both in advance (there's nothing on Henderson/Walnut Pike)) as well as directing traffic (literally construction guys pointing fingers at this large, busy intersection with multiple turn lanes. Not effective or safe. And they have the audacity to yell at some of the cars not listening to their unclear pointing). 2. I would expect some respect to get traffic through when they can. I sat there for 10 minutes this morning when there was multiple instances where they were in between tasks and could have let us go for a few minutes, but they kept us waiting.

closed #184774

Traffic Related Complaints

Case Date:
7/26/2023

The pedestrian crossing at 10th Street and John Hinkle Place by Woodbridge apartments is very unsafe. I cross there every morning to get to the bus stop on the other side of the street. Cars don't slow down, and I've never had someone stop to let me cross before if though I'm waiting. They pick up speed on the slight hill in both directions. Could there be a flashing light, a pedestrian-triggered stoplight, or some other way of allowing safe crossings at that busy road to access the bus stop?