uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (23)

closed #164913

Potholes, Other Street Repair

Case Date:
6/21/2018

The brick street on Park Avenue, in between 8th and 9th Streets, was torn up by the construction crews when they built the new Fiji house. They completed the work a while ago, but the street is still in awful shape. There are ruts everywhere, and a huge hole just south of 9th street. The bricks need to be replaced on this whole block.

closed #165349

Potholes, Other Street Repair

800 N Washington ST

Case Date:
8/1/2018

Last year, the section of the sidewalk at Washington and Cottage Grove was replaced, but the workers left a trench in the road that collects water and breeds mosquitos. I couldn't help but notice when similar work was done this summer on 10th street and a layer of pavement was laid alongside the sidewalk to fill the trench there. Probably just an oversight but it'd be nice to get this job completed.

closed #165775

Potholes, Other Street Repair

151 South Lincoln Street

Case Date:
9/3/2018

The bike lane on Lincoln between Fourth and Kirkwood, opposite the new construction at the southwest corner of Kirkwood and Lincoln never got fixed up after the construction at the southeast corner. So there is a seam running the length of it making it be at two different levels. Because of the construction, the street is really narrow there, but the bike lane is half unusable. This is a dangerous situation and the bike lane there should be fixed.