Potholes, Other Street Repair
- Case Date:
- 9/29/2017
I respectfully request that you paint crosswalks at the corners of Daniel and Forrestor and David and Forrestor in the Hyde Park neighborhood. We used to have crosswalks, but they were covered over on those three corners during recent paving and need to be repainted. Many people cut through the neighborhood on those streets and often roll through the stop signs. The Crosswalk will make it safer for the children and others who cross those streets on the way to Schmalz Park. Thank you for considering this request. Have a wonderful autumn.
Potholes, Other Street Repair
821-913 North Blair Avenue
- Case Date:
- 10/5/2017
Storm drainage system on N Blair needs concrete repaired before winter. Ends if metal grating are exposed and may catch on snow plows
Potholes, Other Street Repair
1500-1598 North Dunn Street
- Case Date:
- 10/6/2017
Major construction debris is littering Dunn by the large construction crews entering and exiting the site across from the Football stadium. Completely hazardous to any 2 wheel vehicle, let alone potentially damaging to cars by flipping up rocks
Potholes, Other Street Repair
1260 N Crescent RD
- Case Date:
- 10/21/2017
Utility cuts across roadway need patched & leveled
Potholes, Other Street Repair
414-420 South Fess Avenue
- Case Date:
- 10/30/2017
Several potholes in the alley between 404 and 414 S. Fess Ave.Please fill them if possible. Thanks.
Potholes, Other Street Repair
1909-2001 East Hillside Drive
- Case Date:
- 11/5/2017
Pot hole forming at storm drain along Hillside
Potholes, Other Street Repair
1218 N Crescent RD
- Case Date:
- 11/6/2017
Utility cuts across Crescent Rd need patched & leveled or paved
Potholes, Other Street Repair
- Case Date:
- 11/9/2017
I request that Middle Court be re-paved westward from Harvey to the cul-de-sac just past Westwood Drive.
Potholes, Other Street Repair
- Case Date:
- 11/28/2017
Pothole in front of the teachers' parking lot next to Binford school on E Second.
Also one on Woodscrest right before the intersection with E Second, coming from the direction of E Third.
Potholes, Other Street Repair
1218 N Crescent RD
- Case Date:
- 12/1/2017
Utility cuts across N Crescent Rd have settled, they need patched & leveled or milled & paved