closed #161451
Potholes, Other Street Repair
821-913 North Blair Avenue
- Case Date:
- 10/5/2017
Storm drainage system on N Blair needs concrete repaired before winter. Ends if metal grating are exposed and may catch on snow plows
Storm drainage system on N Blair needs concrete repaired before winter. Ends if metal grating are exposed and may catch on snow plows
I respectfully request that you paint crosswalks at the corners of Daniel and Forrestor and David and Forrestor in the Hyde Park neighborhood. We used to have crosswalks, but they were covered over on those three corners during recent paving and need to be repainted. Many people cut through the neighborhood on those streets and often roll through the stop signs. The Crosswalk will make it safer for the children and others who cross those streets on the way to Schmalz Park. Thank you for considering this request. Have a wonderful autumn.
The pavement on Washington Street behind the recently completed Chocolate Moose Building is in really bad shape. It is kind of filled in but not level with old pavement and has lots of gashes in it. The bike lane there is especially bad. The new pavement south of 2nd street is great, especially where the cars are on the left side.
Street work at the intersection of Walnut and Allen left potholes that may need to be filled in.
Subsiding (Vectren?) utility cut on the south side near the east end of E First Street near the intersection with Jordan.
Esan Thai lot paved; contractor made a mess on the alley & parking lot
Pavement needs to be repaired at both ends of 407 E. Blue Ridge Dr.
On E second Street parallel to the footbridge near Anita there is a water meter cover that has not been raised to the level of the street which makes it feel like you are driving over a pothole.
Just north of the entrance to Convenient Food Mart on N. Dunn Street at 17th Street is a deep, rough, car-shaking hole left by a company who had done work in the area. It is in the southbound lane. And just north of that, at the old entrance into the now-turndown apartment complex off Dunn, is a rough and deep cut across both lanes of traffic. the company who made the cut is one working on the new apartment complex. They threw some asphalt at the holes, but it is quite rough on traffic. to avoid the worst of the holes you have to drive into oncoming traffic. Help!
When does the city intend on finishing this section of road? Ever since the bridge was completed it doesn't look like any work has been done at all to finish this one bit of road at all, and it's been months! East-West traffic is already a nightmare for this county because of the construction on I-69, Second, and Third Street, and yet the one route that can really act as a good alternate route to help alleviate some of that traffic is hampered by this abandoned project. While the detours tell people to go down towards 11th Street, we all know that way too many people are cutting through the neighborhood where there are plenty of children trying to play outside. This is nothing but ridiculous!