Potholes, Other Street Repair
800 N Washington ST
- Case Date:
- 8/1/2018
Last year, the section of the sidewalk at Washington and Cottage Grove was replaced, but the workers left a trench in the road that collects water and breeds mosquitos. I couldn't help but notice when similar work was done this summer on 10th street and a layer of pavement was laid alongside the sidewalk to fill the trench there. Probably just an oversight but it'd be nice to get this job completed.
Potholes, Other Street Repair
151 South Lincoln Street
- Case Date:
- 9/3/2018
The bike lane on Lincoln between Fourth and Kirkwood, opposite the new construction at the southwest corner of Kirkwood and Lincoln never got fixed up after the construction at the southeast corner. So there is a seam running the length of it making it be at two different levels. Because of the construction, the street is really narrow there, but the bike lane is half unusable. This is a dangerous situation and the bike lane there should be fixed.
Potholes, Other Street Repair
225 N Washington ST
- Case Date:
- 10/5/2018
There is mud all the way down the alley that is being tracked by foot traffic and vehicles. The mud is being tracked into the Cantol Wax building by the residents. It is also being tracked onto the city sidewalks leaving the alley due to Miller Pipeline working on the gas lines in the alley. 211 N Washington St