uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (317)

closed #178010

Potholes, Other Street Repair

W 7th St & N Waldron St, Bloomington, IN 47404, USA

Case Date:
10/27/2021

The NE corner of 7th & Waldron at the street level was torn up MONTHS ago during the Near Westside sidewalk and ramp work. This corner has never been either completed or the pavement restored. When will this finally be finished? I see this as an issue as we go into the rainy winter, where this area will be more prone to icing, which will create a potential road hazard.

closed #175303

Potholes, Other Street Repair

W Tapp Rd, Bloomington, IN 47403, USA

Case Date:
3/31/2021

There are several potholes that need filled on the hill on West Tapp Road between the roundabout and South Rockport Road.

closed #172599

Potholes, Other Street Repair

West 7th Street

Case Date:
5/29/2020

Alley between W 6th & 7th and between Maple and Fairview needs To have holes filled in to prevent standing water and mosquitoes breeding. Thank you

closed #185164

Potholes, Other Street Repair

Winding Way & Kingsley Dr, Bloomington, IN 47404, USA

Case Date:
8/22/2023

Pothole

closed #176076

Potholes, Other Street Repair

Case Date:
6/9/2021

Just checking in on closed case, thank you. Could sure use some asphalt thrown down if delay in paving Pickwick will be long. #175370 Potholes, Other Street Repair: Other: As rain come downhill on the street, it sometimes overwhelms our drainage tunnel. Over the years this created a line of crumble in Pickwick, in the last two years this has become a serious hazard for bicycles, pedestrians and not too good for our cars. Is there a chance we could get some blacktop put down on this? I'll be taking bids to resurface my driveway this summer, and it would be best if the street was repaired before this work gets done. Thank you! Jim Murray 1306 S Pickwick Pl Bloomington, IN 47401 812-339-8876 (home) 812-345-5513 (mobile) jmurray@iu.edu Assigned to Danna Workman Attachments See all thumbnails 4/8/2021 606f27210dde8 4/8/2021 Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed. History 4/8/2021 13:48:09 Closed by Chris Axsom Jim, thank you for your Ureport. Pickwick is on the schedule to be repaving tentatively in May. Sent notification to Danna Workman, Anonymous 4/8/2021 12:36:49 Danna Workman commented on this case. Supervisor will check into your concern. Sent notification to Danna Workman, Anonymous 4/8/2021 11:54:08 Anonymous assigned this case to Danna Workman Sent notification to Danna Workman, Anonymous 4/8/2021 11:54:08 Opened by Anonymous 1306 S Pickwick PL

closed #176097

Potholes, Other Street Repair

Case Date:
6/10/2021

Pothole in the east bound lane in front of Bloomington Hospital on W Second Street, heading towards College,

closed #176776

Potholes, Other Street Repair

Case Date:
7/30/2021

Nasty pothole in the 300 block of Kingston Drive. It is south of the turn for Chick-Fil-A.

closed #176819

Potholes, Other Street Repair

Case Date:
8/3/2021

Number of deep and dangerous potholes along the northern edge of the public right of way. Cars are bottoming out.

closed #177927

Potholes, Other Street Repair

Case Date:
10/19/2021

On the north side of the newly-paved 7th Street, between Dunn and College Avenues, there are numerous locations where sewer and water drain covers are sinking into the ground...it is excessively bumpy, hazardous and only going to get worse unless addressed immediately.

closed #179219

Potholes, Other Street Repair

Case Date:
3/10/2022

At the intersection of East Arden Dr, and Sycamore Ct., a cover used to prevent construction debris from entering the storm sewer inlet has yet to be picked up. It may pose a traffic or pedestrian hazard. Thank you.