uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (317)

closed #184318

Potholes, Other Street Repair

1002 E Southdowns DR

Case Date:
6/24/2023

On Southdowns, in the bike lane opposite the entrance to the Woodlawn parking lot across from Bryan Park pool, there's a hole that is wide enough to swallow a bike tire and make someone crash. In fact, people have crashed there. It's a trap for bike tires. It's been that way for 5 years or more.

closed #175278

Potholes, Other Street Repair

1001 E University ST

Case Date:
3/31/2021

Pothole. Hawthorne at University

closed #171823

Potholes, Other Street Repair

1000-1204 E 17th St, Bloomington, Indiana, 47408

Case Date:
2/25/2020

Series of potholes in the 2200 block of Henderson, in the south bound lanes, heading towards Winslow, by the No Parking sign. Past Graham.

closed #185462

Potholes, Other Street Repair

100 N Bryan AVE

Case Date:
9/7/2023

5th Street between Jefferson and Union streets is beyond the repair of simply fixing pot holes. Some of the damage on the street is due to property owners fixing their sewer lines and then not repaving the street. The location is on 5th street south of the house.

closed #176076

Potholes, Other Street Repair

Case Date:
6/9/2021

Just checking in on closed case, thank you. Could sure use some asphalt thrown down if delay in paving Pickwick will be long. #175370 Potholes, Other Street Repair: Other: As rain come downhill on the street, it sometimes overwhelms our drainage tunnel. Over the years this created a line of crumble in Pickwick, in the last two years this has become a serious hazard for bicycles, pedestrians and not too good for our cars. Is there a chance we could get some blacktop put down on this? I'll be taking bids to resurface my driveway this summer, and it would be best if the street was repaired before this work gets done. Thank you! Jim Murray 1306 S Pickwick Pl Bloomington, IN 47401 812-339-8876 (home) 812-345-5513 (mobile) jmurray@iu.edu Assigned to Danna Workman Attachments See all thumbnails 4/8/2021 606f27210dde8 4/8/2021 Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed. History 4/8/2021 13:48:09 Closed by Chris Axsom Jim, thank you for your Ureport. Pickwick is on the schedule to be repaving tentatively in May. Sent notification to Danna Workman, Anonymous 4/8/2021 12:36:49 Danna Workman commented on this case. Supervisor will check into your concern. Sent notification to Danna Workman, Anonymous 4/8/2021 11:54:08 Anonymous assigned this case to Danna Workman Sent notification to Danna Workman, Anonymous 4/8/2021 11:54:08 Opened by Anonymous 1306 S Pickwick PL

closed #176097

Potholes, Other Street Repair

Case Date:
6/10/2021

Pothole in the east bound lane in front of Bloomington Hospital on W Second Street, heading towards College,

closed #176776

Potholes, Other Street Repair

Case Date:
7/30/2021

Nasty pothole in the 300 block of Kingston Drive. It is south of the turn for Chick-Fil-A.

closed #176819

Potholes, Other Street Repair

Case Date:
8/3/2021

Number of deep and dangerous potholes along the northern edge of the public right of way. Cars are bottoming out.

closed #177927

Potholes, Other Street Repair

Case Date:
10/19/2021

On the north side of the newly-paved 7th Street, between Dunn and College Avenues, there are numerous locations where sewer and water drain covers are sinking into the ground...it is excessively bumpy, hazardous and only going to get worse unless addressed immediately.

closed #179219

Potholes, Other Street Repair

Case Date:
3/10/2022

At the intersection of East Arden Dr, and Sycamore Ct., a cover used to prevent construction debris from entering the storm sewer inlet has yet to be picked up. It may pose a traffic or pedestrian hazard. Thank you.