Potholes, Other Street Repair
1476 S Weatherstone LN
- Case Date:
- 3/29/2022
I would like to request that Weatherstone Lane and E. Cobblefield Ct. are evaluated for repaving, and or/patching. There are several spots throughout the complex that have needed attention for a long time. thanks
Potholes, Other Street Repair
1490 N Fee LN
- Case Date:
- 5/27/2022
Turning right onto 17th from Fee Lane, we hit a bump somewhere in the right lane. Thank you so much for always fixing the potholes so quickly!
Potholes, Other Street Repair
1490 N Fee LN
- Case Date:
- 8/3/2022
potholes
Potholes, Other Street Repair
1490 N Fee LN
- Case Date:
- 2/7/2023
More potholes
Potholes, Other Street Repair
1495 W Allen ST
- Case Date:
- 2/17/2020
There is a pothole on Adams Street (in the southbound lane), between 2nd/Bloomfield and Allen Streets.
Potholes, Other Street Repair
15 S Kirby Alley, Bloomington, IN 47401, USA
- Case Date:
- 3/2/2021
Multiple, deep potholes in the entire 300 block of S. Kirby Alley. End to end.
Potholes, Other Street Repair
15 S Kirby Alley, Bloomington, IN 47401, USA
- Case Date:
- 5/24/2024
Large pothole capable of popping tires.
Potholes, Other Street Repair
150 W 17th St, Bloomington, IN 47404, USA
- Case Date:
- 11/9/2021
Deep narrow pothole beside square donuts.
Potholes, Other Street Repair
1500 W 15th ST
- Case Date:
- 9/20/2023
The part of Lindbergh between 15th and 17th that has been left unfinished for a few years is becoming more treacherous. Only one lane is passable, but it is a two-lane road. There are deep potholes along the road and there is plant growth that needs to be cut so that the northbound lane is useable when there is a car in the southbound lane. Please fix the issues asap.
Potholes, Other Street Repair
1500 W 15th ST
- Case Date:
- 9/1/2023
Lindbergh, between 11th St. and 17th St. has been left unfinished for years. It is a disaster to drive on, and the portion from 15th St to 17 St is basically a one-way lane as there isn't room for 2 cars using each lane. And now there is plant growth that is impeding the lane heading north to make the street even narrower. I see it is highlighted on the map of scheduled projects, but it isn't listed in the list for scheduled projects. It really feels like it has been forgotten. Please follow up on it and finish it.