Potholes, Other Street Repair
- Case Date:
- 8/11/2023
This is a cul-de-sac in Park Ridge East. The paving at entrance to the street is in disrepair. At the top of the cul-de-sac is a huge pot hole. The center of the street is breaking away. To drive up and down this street many times a day is frustrating. It would be wonderful to have it repaved.
Potholes, Other Street Repair
- Case Date:
- 10/17/2023
It seems that an asphalt truck may have had its tailgate open a little and dropped a lot of asphalt on the south side of Rogers and Winslow.
Potholes, Other Street Repair
- Case Date:
- 10/2/2023
Pot hole in street just as I am turning South out of 305 N. Pete Ellis Drive onto Pete Ellis street.
Potholes, Other Street Repair
- Case Date:
- 11/4/2023
There is a broken part of the alley that is hazardous to cars lower to the ground in the alley connecting E University St and E 1st St. It is located near the garages of 309 and 311 E 1st St
Potholes, Other Street Repair
- Case Date:
- 11/8/2023
Ummh... weeks ago I reported that the streetlight at Dodds and Fairview is out. It has been for some time. The "stop line" and crosswalk markings south of second on Rogers are also in need of replacement. The time change has come, and these safety measures are needed more than ever.
Potholes, Other Street Repair
- Case Date:
- 11/16/2023
It is 7:30 AM and there is a crew using a jackhammer directly outside my window. Can they... not do that outside business hours? Some of us work late and would like to sleep. Thanks.
Potholes, Other Street Repair
- Case Date:
- 11/17/2023
There are two potholes in the middle of the street on this block.
Potholes, Other Street Repair
- Case Date:
- 6/23/2022
I saw duke engery blocking car on street while working on street
Potholes, Other Street Repair
- Case Date:
- 8/19/2021
The bike lanes on Smith Rd between 3rd and 10th street have a lot of debris, potholes, broken pavement. That is not safe for bike lanes.
Also, the narrow shoulder on 46 just east of 446 has a spot about a quarter mile in where the pavement has crumbled and on a bike you have to move into the car lanes. Budy road, and we just use the shoulder to get to Kerr Creek turnoff. Please repair that missing,crumbled pavement. Thanks
Potholes, Other Street Repair
- Case Date:
- 9/18/2021
The bike lanes on Smith Rd between 10th St and Morningside, both sides, are a mess. Gravel, glass, potholes, debris. You can’t expect bike riders to safely ride with bike lanes like that.