Potholes, Other Street Repair
Campus Walk Landmark, 508 S Fess Ave, Bloomington, IN 47401, USA
- Case Date:
- 10/17/2023
Can anything be done here? I understand it is for draining storm water, but the hole is quite large, and the cover is very loose, I could probably take the whole grate off and move it
Potholes, Other Street Repair
Campus Walk Landmark, 508 S Fess Ave, Bloomington, IN 47401, USA
- Case Date:
- 10/17/2023
Pictures of the alley that crisscross between henderson and fess just a half block north of 2nd street. Whole alley is deteriorating
Potholes, Other Street Repair
429 S Henderson ST
- Case Date:
- 10/17/2023
More of the deteriorating Alley way off S Henderson
Potholes, Other Street Repair
429 S Henderson ST
- Case Date:
- 10/17/2023
Entrance off S Henderson to 427 alley way is crumbling as well.
Potholes, Other Street Repair
305 E 9th ST
- Case Date:
- 10/17/2023
The alley off 9th street between lincoln and grant is deteriorating and has many potholes
Potholes, Other Street Repair
404 E Laurelwood DR
- Case Date:
- 10/17/2023
Potholes in the culdesack as well as at the entrance from wilefarm road
Potholes, Other Street Repair
1151 W Twin Oaks RDG
- Case Date:
- 10/18/2023
Pothole in middle of road needs filled in across from driveway of this address.
Potholes, Other Street Repair
2006 W Fountain DR
- Case Date:
- 10/18/2023
Treacherously rough road; worried about potential damage to vehicle
Potholes, Other Street Repair
512 S Rogers St, Bloomington, IN 47403, USA
- Case Date:
- 10/18/2023
There is a large piece of metal at the intersection of 2nd and Rogers (presumably covering up a pothole or other road issue). However, it is in the line of traffic and creates an extremely loud noise every time a vehicle drives over it making it difficult for anyone living in the general vicinity to sleep. Perhaps a different methodology could be used until the necessary road repairs are completed?
Potholes, Other Street Repair
808 W 6th ST
- Case Date:
- 10/19/2023
There is a pot hole in the 800 bock of W 6th St. It should be patched before freezing weather ends access to hot asphalt.