closed #177741
Potholes, Other Street Repair
W 7th St & N College Ave, Bloomington, IN 47404, USA
- Case Date:
- 9/30/2021
Left turn light does not go green.
Left turn light does not go green.
The NE corner of 7th & Waldron at the street level was torn up MONTHS ago during the Near Westside sidewalk and ramp work. This corner has never been either completed or the pavement restored. When will this finally be finished? I see this as an issue as we go into the rainy winter, where this area will be more prone to icing, which will create a potential road hazard.
There are several potholes that need filled on the hill on West Tapp Road between the roundabout and South Rockport Road.
Alley between W 6th & 7th and between Maple and Fairview needs To have holes filled in to prevent standing water and mosquitoes breeding. Thank you
Pothole
At the intersection of East Arden Dr, and Sycamore Ct., a cover used to prevent construction debris from entering the storm sewer inlet has yet to be picked up. It may pose a traffic or pedestrian hazard. Thank you.
The garbage trucks keep damaging the road in front of E 3425 Adair Ln (see attached picture taken on April 8, 2022). You patched the hole in November 2020 and May/June 2021, but the problem is not getting better. The asphalt that's piling up is not only an eye sore, but also a real safety hazard. Is there a way to provide a more permanent fix? For example, by first removing a larger area of the old surface cover and adding a stronger foundation/base layer before applying a new surface cover? Thanks for your consideration.
The alley next to my house needs to be graded (my car scrapes the middle/high section of the alley). You already did the section that is off of Highland Avenue (thank you!), but the part of the alley that connects to Ballantine Road needs to be done. It starts at the alley entrance from Ballantine Road (503 S. Ballantine Rd) and goes about halfway down the alley. In this area, the middle of the alley needs to be scraped down and gravel added. It would be great if you could add gravel to the whole alley as some sections are muddy after a rain. Thank you.
The issue from case #179307 has already returned from the recent storms.
What is the TIMELINE for paving Lindbergh St between W17th and W 11th? I would like to share your short answer tonight as I preside over the Crescent Bend Neighborhood Association meeting. Also, I would appreciate update on speed reduction plan for W 17th St, which we submitted to UReport last month.--Thanks for information! Sharon Roualet, President CBNA