Potholes, Other Street Repair
1200 S Rogers ST
- Case Date:
- 8/7/2026
The newly installed speed bump on W. Patterson Dr. is poorly constructed and poses a serious hazard to both drivers and their vehicles. The transition from the speed bump back onto the roadway is so abrupt and uneven that even driving over it at a reasonable speed can cause significant impact. Unfortunately, I know this firsthand, as I drove over it at a reasonable speed and it was enough to bend one of my vehicle’s wheels.
What makes this especially frustrating is that W. Patterson Dr. was closed for an extended period, yet many of its existing problems, which include potholes, severely rough pavement, and recessed manholes were not addressed. Instead, a new speed bump was installed so poorly that it has effectively created another roadway hazard.
A traffic-calming device should improve safety, not damage vehicles. I strongly urge the responsible department to inspect and correct this speed bump and its transition immediately before additional vehicles are damaged or someone is injured.
Potholes, Other Street Repair
1900 S Olcott BLVD
- Case Date:
- 8/7/2026
Potholes in road need filling.
Potholes, Other Street Repair
2731 E Brigs BND
- Case Date:
- 8/7/2026
Potholes in road need filling.
Potholes, Other Street Repair
318 S Washington ST
- Case Date:
- 8/7/2026
Inner bike lane paint almost completely worn off. Cars routinely driving in the bike line because they can’t see it.
Potholes, Other Street Repair
402 S Highland AVE
- Case Date:
- 8/6/2026
The gravel alley along side the house needs to be resurfaced. There is a valley so deep in front of our parking spot that our car gets stuck in it. Please repair soon. Thank you.
Potholes, Other Street Repair
2129 S Azalea LN
- Case Date:
- 8/5/2026
I submitted a request for street repairs on Azalea lane this Spring due to significant damage due to school traffic in the neighborhood, especially at the intersection of Azalea and Wylie Farm Road. This is the intersection where a lot of people turn on and off Azalea to go to Bloomington south. I received a response that there were plans to repave all of Azalea Ln this summer. It is now the end of summer and there has been no work on Azalea so I just wanted to check in on this. Thank you!
Thanks!
Potholes, Other Street Repair
1314 S Henderson ST
- Case Date:
- 8/4/2026
Recently repaired hole in new Henderson pavement is already failing. The substrate has failed allowing pavement to collapse into it as it heats up. More than a simple patch is needed
Potholes, Other Street Repair
1413 S Dunn ST
- Case Date:
- 8/4/2026
Utilities hole from the fiber optic build left a round hole through the asphalt in the parking space. It is eroding under the street
Potholes, Other Street Repair
1599 S Ira ST
- Case Date:
- 8/3/2026
Pothole on roundabout
Potholes, Other Street Repair
730 W Howe ST
- Case Date:
- 8/3/2026
Cracked sidewalk