Potholes, Other Street Repair
- Case Date:
- 3/4/2024
Pot holes to report:
Several on Indiana Avenue at the alley that is just directly south of the railroad bridge.
Also several potholes in the intersection of Indiana Avenue and 13th Street too.
Potholes, Other Street Repair
- Case Date:
- 2/23/2024
Adam st from Bloomfield Rd to Allen St northbound needs strip patching or what ever the Coty did to the southbound lane a couple of years ago
Potholes, Other Street Repair
- Case Date:
- 3/9/2024
Several potholes at the intersection of Franklin Dr and W 3rd St, particularly in the left turn lane from Franklin in the direction of Downtown. These potholes also affect the westbound bike labe on W 3rd.
Potholes, Other Street Repair
- Case Date:
- 3/9/2024
North Crescent Road has a bad patch job turned into a deep pothole right sode of the road when heading south. Left turn lane concrete on North Cresent is deteriorated just short of where it meets Fountain Drive. Fountain Drive has several deep potholes where it ys off from 11th Street. Fountain Drive has several potholes at the rail line. Lindbergh drive between 17th and 11th was under construction and never finished. Road is unsurfaced and there is a GIANT pothole that causes travel to be unsafe as drivers have to merge into the other lane to avoid.
Potholes, Other Street Repair
- Case Date:
- 3/18/2024
Shilo Rd. is/has been a mess for years, filling in the numerous pot holes, surface repairs are no longer viable and quickly become the same (problem). When/ is there any plans to repave
Potholes, Other Street Repair
- Case Date:
- 3/24/2024
Close to 610 S Pleasant Ridge on the left-hand side of the incline are a bunch of previously filled pot holes that require refilling. The edge of the road is also pretty deteriorated in one spot.
Potholes, Other Street Repair
- Case Date:
- 3/22/2024
asphalt on Highland between 1st and 2nd streets has been repaired, but is very lumpy. Also, pothole around sewer cover on Highland and University. Thanks.
Potholes, Other Street Repair
- Case Date:
- 3/21/2024
Rough temporarily paved section on heavily traveled road to North High School. Have witnessed several northbound cars swerving to southbound lane to avoid vehicle suspension damage. Accidents waiting to happen! Please finish road repair ASAP.
Potholes, Other Street Repair
- Case Date:
- 3/24/2024
Close to 610 S Pleasant Ridge on the right hand side of the incline is a filled hole that is sagging pretty badly.
Potholes, Other Street Repair
- Case Date:
- 4/10/2024
The bus stop “landing pad” outside of our entrance on East Second Street needs to be replaced with perhaps concrete instead of the current asphalt. The asphalt is crumbling and ground is being pushed up and over the curb as a result. It’s a muddy mess and unsightly.
The condition of the street has deteriorated a great deal since the photo in the report was taken. The asphalt is gone and the mud in now over the curb and onto the grass.