Potholes, Other Street Repair
3424 S Cedarwood CIR
- Case Date:
- 6/4/2022
In the 3400 block of S. Cedarwood Circle, the City dug up the road a few months ago, then never came back to finish the job. The road is a mess with missing asphalt and gravel/debris all around. Can the City get back out here this week to fix this and finish up the work they started? Thanks.
Potholes, Other Street Repair
625 W 7th ST
- Case Date:
- 5/5/2022
Large hole in street that takes up most of the westbound lane ever since water main repair on March 23. It was filled with rock but is getting worse each day.
Potholes, Other Street Repair
306 E 11th ST
- Case Date:
- 4/23/2021
CBU utility repair project in street several months ago was never completed. Street is now crumbling.
Potholes, Other Street Repair
- Case Date:
- 10/11/2018
Greetings- Please direct this to Angie Grubb-Flick's attention.
On Indiana Ave just north of Kirkwood in the east side lane there appear to be two missing water valve lids. We are having a road foot race (city permit obtained) on Saturday morning Oct 27, 2018 and need these lids replaced or filled for safety.
Potholes, Other Street Repair
- Case Date:
- 9/7/2017
The street repair jobs done on Hillside after the construction work this week at the intersection of Clifton is not holding up. It's been gradually sinking into the ground over the last four days with all the traffic going over it. It will likely start causing damage within the next few days if it isn't addressed soon. There's another patch that was part of that same effort at the intersection of Nancy, but it's not quite as bad. But I would suspect it will need addressing shortly thereafter since it also shows signs of settling.