Potholes, Other Street Repair
- Case Date:
- 10/19/2021
On the north side of the newly-paved 7th Street, between Dunn and College Avenues, there are numerous locations where sewer and water drain covers are sinking into the ground...it is excessively bumpy, hazardous and only going to get worse unless addressed immediately.
Potholes, Other Street Repair
W 7th St & N Waldron St, Bloomington, IN 47404, USA
- Case Date:
- 10/27/2021
The NE corner of 7th & Waldron at the street level was torn up MONTHS ago during the Near Westside sidewalk and ramp work. This corner has never been either completed or the pavement restored. When will this finally be finished? I see this as an issue as we go into the rainy winter, where this area will be more prone to icing, which will create a potential road hazard.
Potholes, Other Street Repair
- Case Date:
- 10/29/2021
Open utility cut hole on High Street, at the intersection with Marilyn.
Potholes, Other Street Repair
- Case Date:
- 4/23/2022
The parking stripes on South Dunn are no longer visible between the 1200-1400 blocks. Can these please be repainted? This will help improve parking on the street. Thank you.
Potholes, Other Street Repair
205 E 14th ST
- Case Date:
- 6/9/2022
I made the mistake of driving down 14th St at the new development today when I saw it was open. I cannot believe that the city allows something like this to exist! I have never seen a road in such bad condition within the city and it is upsetting that we continue to allow this to happen.
Potholes, Other Street Repair
215 E 9th ST
- Case Date:
- 1/18/2022
Westside of 215 9th St. - is an old alley that needs repaired or closed down, we are having people park in the yards of 215 & 221 9th Street to make repairs to neighboring houses because the alley is not functional
Potholes, Other Street Repair
- Case Date:
- 6/12/2023
The work going on with utility poles from 17th & Rogers intersection to the Arlington roundabout is often dangerous for traffic. Local businesses are still open since they cut off the intersection itself and adjacent neighbors need access. Basically no street striping is present there’s random marks on one side that would be too tight of a lane, in addition to a partially ground up area of previous striping that still has a lot present and reflectors. The whole road needs redone. When is the projected finish of the utility pole relocation? This is a HUGE hazard.
Potholes, Other Street Repair
- Case Date:
- 7/28/2023
Please remove the two piles of extra concrete that were left on either side of the new water garden the city installed in front of my house at 510 W Allen St. These are eyesores and are left over from the construction.
Potholes, Other Street Repair
- Case Date:
- 7/28/2023
The company installing fiber optic broadband destroyed part of the road in our cul-de-sac, busted a water pipe, and left the road in pretty bad shape. This is a flooding hazard and has damaged the aesthetics of the neighborhood as well.
Potholes, Other Street Repair
206 S Clark ST
- Case Date:
- 8/11/2023
"Road Construction Ahead" sign is still at 206/208 South Clark St. even though the work on East Third appears to be finished.