uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (99)

closed #193717

Potholes, Other Street Repair

1021 S Madison ST

Case Date:
9/24/2024

Fiberoptic cable company made holes in roadway which were then improperly filled in. This is a hazard to pedestrians and cyclists. This is on the corner of Madison and Allen but there are many more around town in areas that company has been through

closed #193716

Potholes, Other Street Repair

1021 S Madison ST

Case Date:
9/24/2024

Fiberoptic cable company made holes in roadway which were then improperly filled in. This is a hazard to pedestrians and cyclists. This is on the corner of Madison and Allen but there are many more around town in areas that company has been through

closed #193678

Potholes, Other Street Repair

1324 S Pickwick Pl

Case Date:
9/21/2024

This area (Pickwick Pl) has needed actual repair for a long time now. How long is the company who did this damage allowed to leave it with multiple big squares of rough concrete? Thank you for your attention.

open #193324

Potholes, Other Street Repair

360 S Wilmington CT

Case Date:
9/3/2024

When the curb between the bike lane and car lane was reconstructed gaps were left in the pavement. Generally the pavement repair was not done to the standard usually expected of Bloomington roads.

closed #193136

Potholes, Other Street Repair

New drive just north of Stonelake Dr. and Rappel

Case Date:
8/26/2024

Trucks are dumping dirt to fill in the quarry behind the 2 motels on Rappel. They do not clean up the mess, gravel, that they leave behind on the street which they also have destroyed because of their weight. With all the construction going on on 46 Crider and Cider had a street swiper clean Rappel while they were working so the street was kept clean. This should also be kept clean. That portion of Stonelake Dr. is in the city it is the city's responsibility to enforce the trucking company to repair the street and keep it clean.

closed #193023

Potholes, Other Street Repair

Case Date:
8/21/2024

About ticket #192627. You closed it with the comment that the contractor has filled the hole. The contractor has half-filled it with gravel that is quickly being scattered as folks park with a wheel in the hole. The hole is growing, and is a hazard. It hasn't been filled. Thank you,

closed #193006

Potholes, Other Street Repair

525 E Grimes LN

Case Date:
8/21/2024

Some utility company cut a hole in the asphalt here and then did an abysmal job of filling it in

open #192857

Potholes, Other Street Repair

101 S Heritage RD

Case Date:
8/13/2024

A citizen called in and explained that a curb in this area caused damage to their tire and has caused damage to others. She wanted to make sure it was reported. She said it was near the first speed bump on Morningside, right off Smith Road. She's already been informed of how to file a tort claim for the incident.

closed #192851

Potholes, Other Street Repair

11th & Maple

Case Date:
8/13/2024

Gravel filled hole in crosswalk from fiber project has persisted for over a month and through multiple uReports.

closed #192831

Potholes, Other Street Repair

Case Date:
8/12/2024

It would be nice if there was a 'Utility Cut' sign on E First Street, warning motorists for the one cut at 1113 E First and the other one near the intersection of First and Ballantine. Unless you plan to pave them today.