closed #171402
Potholes, Other Street Repair
819 1/2 W Kirkwood AVE
- Case Date:
- 1/10/2020
Pothole near south shoulder, eastbound 5th St/ W Kirkwood. Across the street from 816 W Kirkwood
Pothole near south shoulder, eastbound 5th St/ W Kirkwood. Across the street from 816 W Kirkwood
Alley overgrowth
The planters in the chicanes and on West Third Street have not been filled with new plants.
The alleyway between Davison and Walker and Walker and Buckner we have many potholes in them. It is the alleyway closest to W. 3rd St.
Curb behind my property has disintegrated/shoveled away by snow plows. Leading to flooding in my backyard due to run off coming down Jackson St.
This intersection has long been dangerous, but the improvements lately have been GREAT and much improved safety. However, when the crossing sign was installed on this corner, the road was never filled back in. We're only into December, and this pothole is like a crater when riding a bike. Because it is right in-front of the crossing sign, one must go into the pothole in order to activate the button, and then it takes much longer to get out of the pothole and enter the intersection. It's taken me long enough at least two times that vehicles which had slowed to allow me to pass actually started progressing into the intersection again because I couldn't navigate out of the pothole quickly enough. This totally null-and-voids the enter purpose of the signal enough that I've temporarily stopped using it in daylight hours. Even just a temporary fill or cover would be helpful until it can be repaved/sealed. (at the northeast corner of intersection of Rogers and W 4th Street, specifically on Rogers.)
Holes need patched in 400 blk S Walker St
At 2nd and Rogers there is a big pot hole. It is on the north side of the intersection (north of the westbound lane of 2nd) and in line with the east side of the south bound Rogers left turn lane. This is a growing pot hole that looks dangerous when I go by it on my bicycle.
Holes in northbound lane need patched
I'm wondering if you can tell me when W 3rd St is going to be repaved and the speed bumps re-installed (after sewer construction earlier this year). Thanks! Jaclyn