uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (4890)

closed #181200

Potholes, Other Street Repair

E 7th St & N Grant St, Bloomington, IN 47408, USA

Case Date:
8/25/2022

Drain grate has hole

closed #181201

Potholes, Other Street Repair

333 S Henderson St, Bloomington, IN 47401, USA

Case Date:
8/25/2022

Hole in road

closed #181203

Potholes, Other Street Repair

1315 S Stull AVE

Case Date:
8/25/2022

Mid to Jumbo pothole in front of this address. Thank you!

closed #181214

Potholes, Other Street Repair

Case Date:
8/26/2022

Pothole at the corner of Walnut and 6th Street, also one if you continue in the direction of the City Library at #108 6th.

closed #173487

Potholes, Other Street Repair

830 S High ST

Case Date:
8/25/2020

In intersection of High St and E Maxwell Ave, there is a missing steel cover of a water access point. Has been missing for days. Creates a hole about 6" or 8" across. Hazardous.

closed #173501

Potholes, Other Street Repair

3315 E Longview AVE

Case Date:
8/26/2020

The street pavement on Longview is in very poor condition for bicyclists.

closed #173510

Potholes, Other Street Repair

1508 W 11th ST

Case Date:
8/27/2020

Broken catch basin on westbound side of W. 11th Street at around 1508/1510. Broken enough to be wandering pedestrian hazard.

closed #173515

Potholes, Other Street Repair

Bloomington City Hall

Case Date:
8/27/2020

Nasty pothole on Miller Drive, coming from Highland, heading towards Walnut, right before the intersection with Park.

closed #173537

Potholes, Other Street Repair

Bloomington City Hall

Case Date:
8/30/2020

Several potholes on Graham between S Rogers and Madison. At 415 Graham and before, if you are coming from Madison.

closed #173572

Potholes, Other Street Repair

1009 S Grant ST

Case Date:
9/1/2020

Two manhole covers on Sassafras Hill Apartment complex (managed by Hunter Bloomington Properties) have been damaged for over 6 months. As you can see, the damage is quite severe. Rather than fix the issue, HBP has relied on traffic cones/barrels to block traffic from riding over the defective manholes.