closed #203572
Potholes, Other Street Repair
328 E University St
- Case Date:
- 6/19/2025
Alley way breaking apart at entrance
Alley way breaking apart at entrance
No parking zone blocked by weeds and foliage
Lake Monroe jr is growing in this pothole is they could be addressed
After a lift station replacement there are potholes left from the work. The gravel in them is being washed away do to the rains. Please patch the hole. Thank you for all your hard work.
Weeds are growing on Alice street. They need repaved but the least that can be done is them sprayed for weeds.
Street has eroded on the side by the curb. If someone drives too close to that edge of the road, a tire could get caught in the trough.
Yellow "CBS" work safety coat lost and now hanging to be claimed on road construction sign by my home. 3449 E. Longview Ave. "Chambers" name is written on the back of the coat. Please retrieve. Not sure if it is a COB staff person's or one of the Greenway contractors. I told one of the contractor staff today where the coat is hanging but it was not retrieved.
Large pothole on right side, on Discovery Pkwy, heading to 10th, right before the light.
I recently bought a house on W Middle Ct, and there is a large dip in the road right in front of my driveway, so that most sedans would scrape their car coming in and out of the driveway. The problem is that the road dips dramatically in front of the driveway (not that the end of the driveway is at the wrong level). Other houses in the neighborhood seem to have had a similar issue and filled in the gap with cement (I’m not sure if they did it themselves or if the city did it). Is this something you guys can fix? Legally can I pour cement there myself since it’s a public road?
I live in Northwood Estates and travel daily on Kinser Pike from the bypass just to get home. After living here for 22 years, the amount of traffic has increased tremendously, especially BIG trucks. For the past 2 weeks, barrels, tape, etc have been placed there, restricting northbound turning in the left lane separately. What are the specific plans for the development and completion of this project? PLEASE complete this project before school resumes at Arlington and Bloomington High School North because in 1 afternoon I counted 28 buses going Southbound to the bypass. In advance, thank you for replying.