closed #172456
Sidewalk & Curb Complaints
1000-1698 E Winslow Rd, Bloomington, Indiana, 47401
- Case Date:
- 5/16/2020
The multi-use trail on the north side of Winslow Rd has low hanging limbs and bushes growing out into the trail.
The multi-use trail on the north side of Winslow Rd has low hanging limbs and bushes growing out into the trail.
Sidewalk along eastbound 13th Street is rough and uneven between N Forrest Ave and N Walnut Grove.
Overgrown vegetation on the north side of E First St is blocking the sidewalk
There is a lot of vegetation growing across the sidewalk covering more than half the sidewalk and it's invasive stuff, so it should be pulled not just cut back. This extends along the city owned property and somewhat to the adjacent home owner's property.
There are "bump-outs" with pipes extending up from the ground surrounding them. I imagine the purpose for these is to protect pedestrians. The only problem is that they extend into the street, causing pedestrians who would not normally be out into the street this far to be there, and also they make it dangerous for cars turning left on each of these (Walnut onto 14th, 14th onto College)because it narrows the turn access, and it also blocks the site of the driver. Why are we putting pedestrians out into the street? Seems like a dangerous situation to me. Thank you.
The sidewalk on the NE corner of Forrest and 11 is not accessible. It has a severely steep grade and bank (one corner is much higher than the opposite). I would not travel along the block on the North side of 11 between Forrest and Walnut Grove because of it.
Ridgefield IV neighborhood Bob Shaw is the developer. Bob tore out sidewalks august 2022 without city’s permission. Almost 2 yrs later and still no sidewalks. 3 residents with disabilities(one uses a scooter) along with multiple children in neighborhood. We need accessible sidewalks and for the city to go after Bob Shaw!
Utility contractor is using rebar rods for safety fencing around open holes along side walk but they are not using rebar caps on top of the rebar which poses an impailment hazard if someone was to fall into the rebar
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
There are two signs that were blocking the sidewalk all summer saying that the sidewalk ahead was closed for construction. They never served any useful purpose and the construction has been done for weeks. Someone moved them onto the grass, but they should be taken away because you can still bump your head on them.