closed #177091
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
FINSISH THIS PRJECT
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
There are two signs that were blocking the sidewalk all summer saying that the sidewalk ahead was closed for construction. They never served any useful purpose and the construction has been done for weeks. Someone moved them onto the grass, but they should be taken away because you can still bump your head on them.
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
Utility contractor is using rebar rods for safety fencing around open holes along side walk but they are not using rebar caps on top of the rebar which poses an impailment hazard if someone was to fall into the rebar
The curbs for the new bump-outs on Weatherstone need painted a bright color. It is hard for drivers to see the change in the road, especially at night, and if hit, would cause vehicle damage.
There is a lot of vegetation growing across the sidewalk covering more than half the sidewalk and it's invasive stuff, so it should be pulled not just cut back. This extends along the city owned property and somewhat to the adjacent home owner's property.
Overgrown vegetation on the north side of E First St is blocking the sidewalk