Sidewalk & Curb Complaints
123 E 8th ST
- Case Date:
- 9/4/2021
On the sidewalk on the corner of 8th and Washington, there is a square stone block embedded in the sidewalk. It is a tripping hazard. I have stumbled on it twice and this second time I broke my toe. I am not sure what it’s doing there, but it is immovable. It is on 8th St, beside the Stone Mansion on the corner.
Sidewalk & Curb Complaints
354 W 11th ST
- Case Date:
- 9/3/2021
In front of Upland Restaurant, sunflower plant is blocking the entire sidewalk and one of the parking meters. Please ask them to fix this!
Sidewalk & Curb Complaints
622 W 6th ST
- Case Date:
- 9/2/2021
Dangerously uneven sidewalk. South side of 6th
Sidewalk & Curb Complaints
- Case Date:
- 9/1/2021
700 S Eastside Drive. This sidewalk was once sagging and was repaired by the city, now it is flaking again. A hazard for the many pedestrians who walk here daily on their way to campus.
Sidewalk & Curb Complaints
205 E Wylie ST
- Case Date:
- 8/29/2021
The yellow paint on the curb on either side of the alley that runs between 205 and 209 East Wylie Street has worn off and needs to be repainted. Cars are parking right at the edge of the alley, sometimes partially blocking it.
Sidewalk & Curb Complaints
909 S Grant ST
- Case Date:
- 8/24/2021
Overgrown, weed-filled, unsightly bump out. There is also high weeds near stop sign at this corner of Grant and Allen. All bump outs on Allen look terrible.
Sidewalk & Curb Complaints
- Case Date:
- 8/23/2021
Traffic slowing curb cuts installed on Allen are filled with weeds. Walking by them forces you out into the street and visibility is hampered by the weeds
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
Sidewalk & Curb Complaints
2516 E Eastgate LN
- Case Date:
- 8/18/2021
Moving Pod in right of way for over 2 years.
Sidewalk & Curb Complaints
2003 S High ST
- Case Date:
- 8/16/2021
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.