Sidewalk & Curb Complaints
3220 E 3rd ST
- Case Date:
- 8/11/2023
Black top sidewalk put in by apartment contractors at Clarizz and 3rd looks like a turning lane!! Paint the curb and put walking sign on “sidewalk” ASAP please…. Tire marks already on curb where folks have hit it.
Sidewalk & Curb Complaints
227 E Winslow RD
- Case Date:
- 9/19/2018
I would like to request a sidewalk ramp / crossing be installed at the SE corner of Walnut St Pike and Winslow. It looks like there has previously been an accident there and now there is a concrete barricade and guard rail preventing the pedestrians from crossing. So either the pedestrian has to make a somewhat dangerous crossing there, or cross three extra times to go around and back. Thank you!
Michelle Giansante
Sidewalk & Curb Complaints
3411 S Allendale DR
- Case Date:
- 1/7/2020
No access ramps onto sidewalks in Sherwood Oaks neighborhood. Individuals in wheel chairs often use the street, which is quite dangerous due to excessive speeds on Allendale. Kids on bikes are also displaced into the street, another danger to to excessive speeds and failure to stop at stop signs on Allendale. Parents with strollers as well struggle with no access ramps.
Sidewalk & Curb Complaints
1001 E Azalea LN
- Case Date:
- 7/5/2020
There is a lot of vegetation growing across the sidewalk covering more than half the sidewalk and it's invasive stuff, so it should be pulled not just cut back. This extends along the city owned property and somewhat to the adjacent home owner's property.
Sidewalk & Curb Complaints
2487 S Brittany LN
- Case Date:
- 9/1/2020
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.
Sidewalk & Curb Complaints
606 E Moss Creek CT
- Case Date:
- 1/20/2021
there have been "end contruction" signs left here for 6 months , construction is long over, can the signs be removed please
Sidewalk & Curb Complaints
2110 S High ST
- Case Date:
- 6/2/2021
So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.
Sidewalk & Curb Complaints
4007 E Stonegate CT
- Case Date:
- 8/2/2021
There are multiple low-hanging trees on the south side of E Hagan Street that make the sidewalk difficult to pass. I believe these are city-maintained trees on the easement.
Sidewalk & Curb Complaints
2003 S High ST
- Case Date:
- 8/16/2021
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT