closed #177091
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
FINSISH THIS PRJECT
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
I assume you're aware of the damage the gas company has done to the asphalt sidewalk in this area (east side of High St by Childs Elementary), and it looks like they are still working. Please make sure that when they repair the sidewalk, they also repair the area immediately north of their work area up to Rock Creek. They have clearly been driving heavy trucks on it and the edges of the sidewalk are cracked and heaving because of it. You can see at the curb ramp at Rock Creek all their tire marks proving they did it and they've broken the concrete there too. Those of us who use this regularly will greatly appreciate a full repair (don't let them just do the obvious area that they removed). Thanks!
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.