Sidewalk & Curb Complaints
2105 E Arden DR
- Case Date:
- 1/15/2022
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
Sidewalk & Curb Complaints
2110 S High ST
- Case Date:
- 6/2/2021
So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.
Sidewalk & Curb Complaints
2114 E Rock Creek DR
- Case Date:
- 10/15/2022
I had previously filled issue 180907. The contractor has not contacted me regarding repair of the damaged sidewalk due to fiber installation. Could you please urge the contractor to remedy the damage to my cement pad. When they installed the fiber, they lifted the cement pad so it is no longer even with the sidewalk making it a tripping hazard.
Sidewalk & Curb Complaints
2114 E Rock Creek DR
- Case Date:
- 11/1/2022
To Paul Regarding Report #181821. The area is the cement pad between the two trees between the sidewalk and street. The contractors undermined the area under the cement pad and used heavy machinary lifting the cement pad and using heavy machine causing a trip and safety hazard causing an elevation in the cement pad. Attached is a picture. I believe the contractor needs to repair this safety hazard.
Sidewalk & Curb Complaints
2135-2165 E Azalea Ln
- Case Date:
- 6/1/2012
The weeds along the street are overwhelming the sidewalk in this area. Not sure who is responsible for upkeep--city or adjacent property owners.
Sidewalk & Curb Complaints
227 E Winslow RD
- Case Date:
- 9/19/2018
I would like to request a sidewalk ramp / crossing be installed at the SE corner of Walnut St Pike and Winslow. It looks like there has previously been an accident there and now there is a concrete barricade and guard rail preventing the pedestrians from crossing. So either the pedestrian has to make a somewhat dangerous crossing there, or cross three extra times to go around and back. Thank you!
Michelle Giansante
Sidewalk & Curb Complaints
2453-2499 South Henderson Street
- Case Date:
- 9/25/2017
Damaged guardrail on culvert side of street. Can be seen from google maps. I first reported this situation last summer (2016) and was advised city was awaiting contract and materials. I reported it because I feel it could become a safety hazard during the winter months with slick and icy streets.
Sidewalk & Curb Complaints
2487 S Brittany LN
- Case Date:
- 9/1/2020
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.
Sidewalk & Curb Complaints
2501-2511 East 2nd Street
- Case Date:
- 5/15/2018
Honeysuckle and other vegetation on the south side of E. 2nd St. is obstructing part of the sidewalk for a block or so east of Woodscrest Dr.