closed #165658
Sidewalk & Curb Complaints
1935 E 2nd ST
- Case Date:
- 8/24/2018
sidewalk bridge handrail top pieces are loose - at least 2 dozen screws have rusted out. please replace with galvanized screws.
sidewalk bridge handrail top pieces are loose - at least 2 dozen screws have rusted out. please replace with galvanized screws.
2 street cones at south high school
Northeast corner on alleyway next to First United Methodist Church on Washington between Kirkwood and 4th Streets. This broken-up pavement makes coming off this sidewalk onto the alleyway fairly dangerous if you're in a wheelchair.
Graffiti on the south side of the smoke shop building (old subway) on Walnut and 6th.
The issue is that this broken concrete is in front of a wheelchair ramp that can make it difficult to get onto the ramp as you are trying to go up it. The concrete probably needs to be redone.
Covered storm drain
I live in Stier Park at the intersection of Hillside & High Street. Over the last year or two many of the sidewalks have been repaired or made compliant. However, this section between Nancy and High Street has deteriorated to the point of gravel. I believe there are other repairs happening in our general area so would love if this section could also be repaired soon. I will gladly provide a photo. I have attempted attaching a photo multiple times but the form never completes the submission process with a photo attached. Thank you.
Need new bold white block crosswalk markings painted on street. This is a bus stop, near a park with lots of children. Cars rarely come to a complete stop and often run this stop sign. I requested this earlier this year and it was never completed.
This is a problem on High St, not Locust Ct. New signs were installed on the west side of High Street warning that there is a crosswalk coming up at Greenbriar and High. But the signs are obscured by vegetation so that they are not visible to drivers going south on High St.
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.