uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (13)

closed #172281

City Performance

320 W 8th ST

Case Date:
4/22/2020

I knew Longview and Pete Ellis were getting some apartments built in that lot, but apparently it is going to be more than usually allowed? I am SUPER concerned that you're going to be packing extra students (almost all will have cars) on a road that is NOT designed for heavy traffic but SUPPOSEDLY a bike path for bikes. It might be great, but what are the extra precautions taking place to ensure students zipping in and out won't disrupt the greenway and kill cyclists? Hoping some will be cyclists, but realistically there is going to be a lot of in and out speedy traffic there for what was a very calm road fantastic for biking. Want to make sure it's not overlooked. Also, anything big built east of College is going to experience major backup on rush hour times at College and 3rd. I know it's a state intersection but the city needs to look into it and factor in the ability of that intersection to take on more traffic. Something needs to change there. It literally clogs (outside of a pandemic) constantly with left turn traffic from 3rd turning south to College, which block eastbound 3rd street. Time and again. Part of the problem is it clogs at the next light (the city's I would imagine) by Fazoli's as the lights aren't coordinated well if at all. So two concerns: not a bad place to live, including for students - way better than century village hotel, but make sure the bike path remains safe! This can't be presumed. That area will change big time and cyclists need reassurance. And 2) light at 3rd and College is going to be negatively impacted and timing or something needs to be looked at there. The east/west greenway I was hoping was going to be getting ENHANCEMENTS in the next year or two, not becoming a motorist highway :( Thank you.

closed #180840

City Performance

Case Date:
8/1/2022

Today I was almost killed by a motorist on the 7th St. bike trail. There needs to be signage for the motorists. Too many out of town drivers on a regular basis to think it can be a learned infrastructure!

closed #180914

City Performance

Case Date:
8/5/2022

N Smith and Morningside remains dangerous with many not stopping on N Smith. Yes per Planning signs may be "visible" per the book but doesn't mean people expect and abide by them there - flashers or other item especially to protect bikers crossing at Greenway needed. Though State intersection, N. Smith and 10th also remains dangerous for turns during heavy traffic.

closed #182514

City Performance

Case Date:
1/17/2023

Contractor/company installing public project fiber has not provided any advance notice to any neighbors. Instead, we all received flyers AFTER work was done. Several issues with work existed, but the number goes to a voicemail and language barriers prevented communication with staff onsite with some neighbors. Please make sure work and appropriate rehabilitation occurs with large City projects such as this. Machinery should be parked on pavement, not yards, for instance overnight, etc.

closed #183501

City Performance

Case Date:
4/18/2023

#183213 Blocked Sidewalk: # 182909 Blocked Sidewalk FROM ONE MONTH AGO NO RESPONSE!!!! Assigned to Michael Stewart MICHAEL STEWART HASN'T RESPONDED TO CASES FOR TWO MONTHS. I have identified a hazard and the city is doing NOTHING about it. Why have this reporting system if our citizen complaints aren’t being answered?

closed #187441

City Performance

Case Date:
2/27/2024

Can someone provide an update on the Morningside Greenway installation? We're excited and believe it was intended for spring, but didn't know if a more solid date is now chosen. Workers were walking the street the other day looking at trees.

closed #173300

City Performance

121 S Smith RD

Case Date:
8/8/2020

Submitted a report but didn't show up in the system? Someone is going to die, likely multiple, if changes aren't made to Smith and 3rd. New 3rd by the State is great but has caused something to change with the Smith traffic. Left turners are hesitating backing up traffic (no big deal) but they are hesitating because cars behind them are zipping around going straight while folks are trying to wait and turn. Meaning the folks can't turn safely, and when they do POW crashes like tonight at 7 pm happen. Please do a traffic study and coordinate with the State for immediate safety improvement. Please do not punt this to the State, but be involved, as Bloomingtonions are going to die; forget traffic, this is about safety. Ideally there needs to be a left turn green arrow only and then a straight signal but that may need lanes. So I don't know the solution, but cars zipping around hitting left turners, etc. is NOT sustainble.

closed #174036

City Performance

W 17th St, Bloomington, IN 47404, USA

Case Date:
11/1/2020

Why has the construction project on West 17th not been completed? Don't tell me it is behind schedule. I want specifics.

closed #176706

City Performance

Case Date:
7/26/2021

3rd and Smith desperately in need of improvements. Horrible since east 3rd changed. Clogs north in particular. Clogs four way stop and even past bypass. Please prioritize this intersection. It's not just slow but very unsafe.

closed #176759

City Performance

Case Date:
7/29/2021

Can you do something to emphasize the stop signs on N Smith. For biker, pedestrian, and frankly even car safety at that intersection. Was almost just hit turning there by a car on N Smith who didn't understand the rules of the road. Occurs all the time.