- Case Date:
- 11/4/2025
I am extremely disappointed that the City has chosen to keep the 7-Line closed for an additional 4 months. It is disheartening to know that even if we build bicycle and pedestrian infrastructure, they can and will be treated like accessories for contractors to play with. Does the Board of Public Works advocate for the residents of Bloomington or just contractors? This appeared to be against the wishes of Engineering staff- where was this passion to approve when it came to the Bloomington monument a couple of years back that they continued to deny with no justification??
City Performance
4001 S Clear View DR
- Case Date:
- 11/17/2025
Construction leaving dirt and rocks from side walk and drive way around the roundabout and made my motorcycle slipped and caused damage to me and my motorcycle. IT HURT. now i have to fix some stuff on my bike
City Performance
102 S Clark ST
- Case Date:
- 11/20/2025
Note of demolition and rezoning request signs at this address. This is zoned R3 and is surrounded by R3 zoning on all sides. I want to register my opposition to the request because a residence with RU or RM design is inconsistent with nearby residences and property maintenance has been lacking. Past performance in this regard is indicative of future performance.
City Performance
111 S Roosevelt ST
- Case Date:
- 11/20/2025
New construction looks not to be consistent with zoning. This house was demolished and is being replaced with a larger structure. Does it meet zoning requirements for R3? Was a variance or zoning change given with or without public input?