closed #154370
Other
900 W Cascade AVE
- Case Date:
- 7/28/2016
Tree falling onto neighboring property.
Tree falling onto neighboring property.
Veda Stanfield is concerned about the substation. Response via letter thanking her for reaching out and assuring her we're taking these concerns into consideration. Address: 627 W. 7th St. Bloomington IN 47404
New Voices Opera group wrote to thank the mayor for the funds they received through a recent grant they were awarded. Mayor wanted to thank them for the thank-you note and wish them luck.
7th grader is visiting town and asked the mayor for suggestions, what to do.. responded via email.
Wrote a letter to Mayor Kruzan voicing concern with Bloomington Police.
Phyllis & Samuel Guskin wrote re. 1725 E. Hunter Ave. They want to object to a request to subdivide existing single family residential lot at 1900 Atwater. They feel that the land is unsuitable for development because it appears to be a sinkhole. They also feel that the water retention needs should be addressed before any development is permitted. Letter was received by Util. Dept. but referred to COB Planning Dept.
TCC Council Member states that has several issues with Insight. See attached documents for details.
Mr. Clayton sent a letter to the PW Dept. that stated he received a letter from Insight Communucations regarding his channels and needing a converter box to get the package he already has that does not contain premium channels. He stated in the letter that his wife called Insight and ask if they had to have the box to keep getting the package that they currenty subscribe to that does not included premium channels, Insights stated that they would need the box. He would like this addressed.
Ms. Abram of B&L Rentals LLC stated she would like to request a review of cost for application for sewer at 2411 S. Milton Drive. She said she was told by Rebecca Lambert this was not part of neighborhood development and then was informed by Byron Reinhold in early 10/02 this was indeed part of neighborhood development and that hook-on fee was $3,336.73 not including the base fee of $1,280.00. Standard fee of $1,280.00 was paid on 9/6/02.
Mr. Reed stated that he conferred with Mike Bengtson re. costs before he quoted a job. Mr. Bengtson did not quote the sewer connection fee of $1,600.00. Mr. Reed requests that the sewer connection fee of $1,600.00 be returned to him because he was given misinformation.