closed #177527
Trails
- Case Date:
- 9/20/2021
Lights out report along the B-line: 84, 67, 58, 56, 60, light between and opposite side from 26&24, 22, 14, and 40 is very weak.
Lights out report along the B-line: 84, 67, 58, 56, 60, light between and opposite side from 26&24, 22, 14, and 40 is very weak.
B-line light posts 41 and 49 are out. Thank you.
All four lights are out on the B-line bridge over 3rd Street. The area is unusually dark because the park lot behind the Convention Center has been entirely unlighted since about March.
B-line light 141 is out. And 98 blinks - on, off, on, off. Thank you.
On west side of b line between kirkwood and sixth. This handrail goes up against the very edge of the b line, exactly at handlebar height for cyclists. This is a congested part of the b line where it is often necessary to ride at the very edge of the path. It presents a hazard to cyclists. Engineering standards as well as Bloomington City planning documents indicate there should be a foot and a half "shy zone" clear of obstructions at the edge of the path. At the city budget hearings a few months ago parks and rec director testified to the council that Parks and rec does follow engineering guidelines on the b line however I do not believe this handrail qualifies. Can we please get some safety.
West side of b line just south of sixth street. Planter blocking path, restricting effective width of b line to about six feet. The path was engineered to a ten foot width, and parks and rec director testified to council that b line conforms to engineering standards. Did an engineer sign off on this path width restriction right at its most congested point?