closed #169329
Trails
2183-2195 S Highland Ave, Bloomington, Indiana, 47401
- Case Date:
- 7/8/2019
Batting cages at Winslow, could you at least do some clean up. Also, fix U-report!
Batting cages at Winslow, could you at least do some clean up. Also, fix U-report!
A construction sign is down blocking the path along the side of Rogers. This is at Rogers Street & Hays Court - just north of Hays on the west side of the road, but south of Jed Street.
When will you proceed with removal of the batting cages at Winslow? Current area is unsightly and dangerous, you have posted "excuse our mess", but it's been 3 months or more. Please proceed with removal.
Good morning, last evening I went for a walk in Olcott Park and admired the several "prairie" gardens along the walk-ways with mowed paths among them. Today I'm writing to ask this email be forwarded to the landscaper who grew and maintains those gardens. I want to add a smaller version to my own yard and have some questions about who to proceed and wonder whether they might share their knowledge on the topic. Or perhaps they can point me to resources. Thank you.
The trail is totally covered from side to side by a slurry of mud and gravel. This is the Clear Creek Trail. I would give the location as on the Clear Creek Trail between Rockport and That Road, about where Fullerton / Gordon Pike would hit the Clear Creek Trail if it connected through. There is a gravel path that goes from the trail back up the hill towards the east, as a reference point. It is half a mile from Rockport Road on the trail towards That Road.
Parks and Rec Friends - We appreciated that you put down rock on the Creek's Edge Trail earlier this summer where one of the detention ponds drains. However, this past weekend's rains have washed the bulk of that rock from this crossing. We would appreciate a repair of this issue. Thank you!
This photo was taken to exaggerate the issue just a bit by the perspective, but this is an issue. The parking lot on Country Club at the B-Line Trail is getting gnarly with bushes. Is it possible to trip this back?
This is why we can't have nice things . . . Why is this big gravel on the Rail Trail? The nice, even, soft surface of the trail has something like 3 or 4 sections where this big gravel was tossed on the trail and now it is a real issue. The big gravel is unstable for runners and walkers. The big gravel hurts the pads of dogs. And, the big gravel is a disaster to ride a bicycle across on a commute into downtown. This needs to be repaired with the big gravel gone and smaller gravel to match the existing trail surface used. You wouldn't patch a section of the B-Line with wood planks, so why mess up the rail trail like this?
Hello -- where the parking lot and sidewalk end and the Rail Trail begins (at the trailhead on Country Club Drive), there is a growing issue. The height difference between the trail and the sidewalk is becoming a real trip hazard for pedestrians, an accessibility issue for others, and a flat tire waiting to happen for cyclists. Is there a way to get this fixed up a bit? But please, please, do NOT use giant gravel. The parts of the Rail Trail that were patched with giant gravel are a disaster. Leave the bump instead of using big gravel if that is the only set of options.
The bollard at the head of the Polly Grimshaw Trail has broken off its base. The bollard itself is next to the trail out of the way. At this point, there is no protection of the trail or the park from cars/trucks. It seems like at least the broken bollard should be removed from the site and ideally a new one put in place.