- Case Date:
- 1/30/2021
Sidewalk on Montclair along Southeast park, as well as the trail running through the park still haven't been cleared of ice and snow. All the surrounding property owners were able to clear their sidewalks in a timely manner. I believe the city is responsible for the sidewalk along the park.
Trails
2104 E Rock Creek DR
- Case Date:
- 1/28/2022
So when we have a 5 ft concrete sidewalk WE are responsible to clear it for the kids. As propertty owners. Then the city replaces it with 10 ft of asphalt, assuring us that we are no longer responsible for it. “We will take care of it, Parks and Rec will deal with it in a timely manner”. We get 0.7 inches of snow, the path is icy, and the city is nowhere to be seen. We have to clear the now TEN ft of path ourselves to avoid being sued. FU Hamiltlon! This is is less than an inch!