Trails
2104 E Rock Creek DR
- Case Date:
- 1/28/2022
So when we have a 5 ft concrete sidewalk WE are responsible to clear it for the kids. As propertty owners. Then the city replaces it with 10 ft of asphalt, assuring us that we are no longer responsible for it. “We will take care of it, Parks and Rec will deal with it in a timely manner”. We get 0.7 inches of snow, the path is icy, and the city is nowhere to be seen. We have to clear the now TEN ft of path ourselves to avoid being sued. FU Hamiltlon! This is is less than an inch!
Trails
1004 W Country Club DR
- Case Date:
- 9/11/2023
no warning for pedestrians and cyclists at road construction over multipath.
Trails
100 S State Road 46
- Case Date:
- 7/7/2016
Heading west from Pete Ellis on 7th(?) turning into 45/46 underpass there is a dangerous lip if caught at an angle.
- Case Date:
- 5/25/2022
The Polly Grimshaw Trail has shrubbery/trees over hanging such that one has to duck (at least) to avoid the branches while biking. This is especially a problem as it effectively makes the bike path one way in some locations. Please trim the branches to increase safety along the trail. Also, there is poisonous hemlock along the trail. It woudl be great to remediate that section of trail. Thanks!