- Case Date:
- 1/9/2014
I was walking down the B-Line today at approximately 12:10 pm and found it concerning that a city of Bloomington employee driving a small green vehicle was "patrolling" the switchyard by driving to remote locations and idling while using his phone rather than driving the trails. Perhaps a better use of his time would be to salt or plow the b-line, because although the roads are fine, the trail is iced up and difficult to use. Please fix these problems and ensure that city workers are doing their job!
-concerned citizen
- Case Date:
- 9/11/2014
tree downon rail trail
Trails
411-449 West Gordon Pike
- Case Date:
- 9/23/2014
Will the Rail Trail get some new gravel soon? Last Thursday I was on it for the first time since April and the wet summer has made it much more muddy.
- Case Date:
- 10/20/2014
I see that the Winslow trail around the baseball/softball fields is being upgraded. I've heard it will be widened and paved.
Please be sure to put up a sign to remind bicyclists to yield to walkers--the sign you posted on the Jackson Creek Trail would be great. I walk this path 2 times a day. And lately too often bicyclists just plow down the trail expecting walkers to clear out of the way, even when they come upon a walker from behind.
- Case Date:
- 10/29/2014
I am wondering about the wind fall limbs in local parks, am I allowed to pick it up and take it home for my fire place???? Also when the City cuts down trees what happens to the wood??? Thank you for you time. I have lived in many places and Bloomington has some of the best parks I have seen. Thank you for that
- Case Date:
- 11/10/2014
There has been some construction on the trails near the Wesley Sports complex. I use the trail to commute to work by bike every day and noted its bad constitution - especially after heavy rain. I had hope for some improvements but the 'closed for construction' signs have been removed and while the trail is now wider it seems like the construction has been stopped half way. The trail is still very sandy / muddy and parts are very soft so that my bike sinks into the sandy surface which makes it very uncomfortable to rise and also somewhat unsafe. Is the construction already done or just paused?
Trails
2827–3071 S Rockport Rd
- Case Date:
- 1/2/2015
Abandoned bike on clear creek trail doth of rockport
- Case Date:
- 3/29/2015
Sign for Lanham Trailhead of GNP has been torn down. There is a pink survey stake so perhaps this is already known?
Trails
Bloomington Rail Trail
- Case Date:
- 4/9/2015
The water fountain at the trail head near the B-line is continuously running
Trails
McDoel Greenway Corridor
- Case Date:
- 4/25/2015
Water fountain on Bline near Wonderlab is missing buttons. Dog fountain is clogged.