uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (16)

closed #169891

Trails

1900 E Arden DR

Case Date:
8/15/2019

A man was very aggressive towards me on the Limestone trail this morning

closed #169992

Trails

229 W 1st ST

Case Date:
8/22/2019

This was reported to me by a citizen: The little steps on the B-line near 1st & Morton. The tops of some of the steps are loose and wobbly.

closed #170750

Trails

748 S Morton ST

Case Date:
10/18/2019

On the B-Line light number 63, just north of Dodds St. is not working at night.

closed #170878

Trails

2400 S Rogers ST

Case Date:
11/4/2019

Just south of the intersection of Rogers and Coolidge the multi-use path on the west side of Rogers is heavily impeded by overgrowth of a tree. This is dangerous. As part of the B-Line detour, this needs to be trimmed back.

closed #170880

Trails

1606 S Rogers ST

Case Date:
11/4/2019

Near the power substation on Rogers across the street from Switchyard Park the multi-use path on the west side of Rogers is covered in gravel. The gravel runs the length of the substation north to south and needs to be swept up This is dangerous. As part of the B-Line detour, this should be deemed unacceptable for the City to allow for such unsafe conditions.

closed #167815

Trails

301 W Country Club DR

Case Date:
3/18/2019

I've recently noticed the Rail Trail between Country Club Drive and Gordon Pike has sections of large gravel (see attached photo). I appreciate that maintenance is being done, assuming the City is responsible for this work. But, I am concerned because this large gravel is inconsistent with the existing surface for the trail. As a bike commuter and runner on this section of the trail, I was disappointed to see large gravel appear on the surface. The Rail Trail is a great surface to run and walk on and commute on. These patches of large gravel pieces diminish it's utility and enjoyment. Are there plans to use large gravel more often on the trail? I request that the smaller, packed surface be maintained. Thank you for your attention to this matter. I look forward to hearing from you about the maintenance of the trail. Have a great day.