Trails
245 W Patterson Dr, Bloomington, IN 47403, USA
- Case Date:
- 11/10/2022
People walking north along the b line often walk along the left hand side of the bridge ramp to get to the Patterson sidewalk, might it be a good idea to pave this? There is a dirt path formed in the grass here.
- Case Date:
- 1/30/2021
Sidewalk on Montclair along Southeast park, as well as the trail running through the park still haven't been cleared of ice and snow. All the surrounding property owners were able to clear their sidewalks in a timely manner. I believe the city is responsible for the sidewalk along the park.
Trails
2120 S Highland Ave, Bloomington, IN 47401, USA
- Case Date:
- 2/8/2021
if it is possible to plow this trail for snow removal during hours of operation, i would be most appreciative
Trails
1900-1998 S Rogers St, Bloomington, Indiana, 47403
- Case Date:
- 11/14/2019
The attached photo shows the detour for the B-Line Trail (closed for Switchyard construction) around 11am today. I had to carry my bike across the void. I am concerned that someone with accessibility issues who cannot lift their bike, or is in a wheelchair, would not be able to get by. The sidewalk on the opposite side of the road is closed as well.
This is the west side of Rogers just north of the Rockport intersection. I do not see how this is allowed to happen.
Trails
1601 S Rogers St, Bloomington, IN 47403, USA
- Case Date:
- 6/20/2022
Pictured above: the view from a bicycle seat as cyclist (on a bike path/sidewalk) approaches the circular loop at the southern end of the Grimes/Patterson parking lot. (Note: the problem I want to highlight is similar when cyclist is heading south towards that "roundabout" from the north on the bike/ped path). And the problem is this: a cyclist can easily not notice until too late that there is no curb cut to allow easy entry to the loop. YES, for safety reasons, the city probably decided NOT to be a curb cut there. Fine. BUT PLEASE, consider a very visible barrier so cyclists can see in advance that they should not proceed forward OR, at least, put some bright yellow paint or striped yellow-black paint on the curb as an attention grabber. Needed on both the south side of the loop and the north side. THANKS!
Trails
1100-1198 S Morton St, Bloomington, Indiana, 47403
- Case Date:
- 10/22/2019
The detour for the B-Line Trail around Switchyard Park right now (10/22/2019) is a product of shortsighted planning, a lack of anticipation of user experiences, and just illogical.
When coming from the north, the detour turns you to the west on a small gravel path and leads to a street - W. Hillside Drive. There are no signs after leaving the B-Line that indicate there is a planned detour route. My assumption is to go on the multi-use path on the west side of Rogers. Good luck getting over there in rush hour traffic on a bicycle. No one on Rogers stops for bicycle or pedestrian traffic trying to cross the street. Why would the detour not go on the multi-use path on the north side of Grimes to Rogers? A sidewalk is in place to get from the B-Line (just north of the bridge) to the Grimes path and then use the light to cross Grimes and Rogers to get on the Rogers path. That is what I will do from now on with my logical thinking that the City did not use in setting up the detour. Also, the accessibility issues with the detour as it is now seem questionable at best, and unsafe otherwise.
After you cross Rogers and get on the multi-use path to head south, the journey is far from smooth sailing. That path is woefully maintained and clearly not prepared to be the detour of the B-Line Trail. The trail bed has gravel, sand, and glass on it, among other debris. Multiple points along the path have overgrown bushes and tree limbs that present a hazard.
The City's detour signs should read: Good Luck to All Who Pass.
Thanks for creating a fun adventure on the commute home today. Nothing like leaving the safety of the B-Line to enter a world of traffic, debris, and obstructions. Well thought out. But, what else do we expect in a city that notoriously fails at detours and construction projects? Not on time and clearly out of the way.
I'll drive tomorrow for my own safety.
Trails
1001-1055 S Henderson St, Bloomington, Indiana, 47401
- Case Date:
- 6/2/2019
Poison Ivy encroaching on sidewalk in Bryan park
- Case Date:
- 5/16/2016
I routinely walk along S. Highland Ave. just north of the Y and then around the Winslow Sports Complex trail. I've noticed a lot of poison ivy growning very close to the sidewalk and then along the trail on the west side (near Highland) near the batting cages. I hope someone will see to it that this is removed or killed so no pedestrians are at risk. Thanks
- Case Date:
- 7/18/2021
At the Sherwood Oaks Park we need a short connecting paved path at the north end where the north/south path (almost) meets the east/west sector. When the gate is closed, pedestrians have to slog through mudpuddles or walk on slippery compacted snow to go from one paved trail to the other. Perhaps when you have equipment out there now repairing the flood damage on the NW corner, the crews could lay this small, but extremely helpful addition.
- Case Date:
- 10/25/2021
I have walked the trail at Latimer Woods at least once a day for the last 4 years. Thanks for providing us with a dirt trail through the woods.
Last fall, I believe employees of Parks and Rec. raked the leaves off the trail after they all fell in November. While this may have seemed like a good idea, the trail became treacherous after a rain, freeze/thaw, or snow.
Please leave the leaves on the trail. They provide traction, and help prevent erosion.
Thanks,
Mike Forney